Removal and replacement procedures 27
3.
Remove the hard drive.
To replace the component, reverse the removal procedure.
When adding hard drives to the server blade, observe the following general guidelines:
•
The system automatically sets all drive numbers.
•
If only one hard drive is used, install it in the bay with the lowest drive number.
•
Drives must be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.
Optional storage controllers provide support for hot-plug capability and drive LEDs. Controller options are:
•
The embedded controller supports non-hot-plug SATA hard drives. Drive LEDs are not supported.
•
Optional SATA controllers support hot-plug SATA hard drives and drive LEDs.
•
Optional SAS controllers support hot-plug SAS or SATA hard drives and drive LEDs.
NOTE:
ACU does not support mixing SAS and SATA drives in the same logical volume.
Battery tray
To remove the component:
1.
Power down the server blade (on page
23
).
2.
Remove the server blade (on page
24
).
3.
Remove the access panel ("
Access panel
" on page
25
).
Summary of Contents for ProLiant BL460c G7
Page 12: ...Customer self repair 12 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 15: ...Customer self repair 15 ...
Page 21: ...Illustrated parts catalog 21 ...