
Verifying the controller is installed correctly
When the controller is installed properly, it undergoes a self test that takes a few seconds. This
happens both when the switch is powered-on after installing the controller and when the controller
is installed while the switch already has power. The LEDs help determine if the controller has passed
the self test, as described in the following table.
Display for a properly installed controller
Location of LED
LED
On briefly while the controller is undergoing self test, then off.
Note
: If the controller was installed with the switch powered off,
and then the switch was powered on, the Test LED will stay on for
the duration of the switch self test.
Switch
Test
Figure 2 (page 5)
and
Figure 3 (page 5)
show the location of
the Test, Fault, and controller Status LEDs on a 5400 zl or 8212
zl series switch, respectively.
Off
Switch
Fault
The LED goes on as soon as the controller is installed and the
switch is powered on, and stays on.
Switch
Module Status
The LED blinks green during initialization. On green means that
controller is operational.
“Controller front panel” (page 4)
shows the location of all
controller LEDs.
Controller
Module Status
The LED goes on when HDD/CF initialization was successful. It is
off by default.
Controller
HDD and CF Status
Error conditions
Error conditions indicated by the controller LEDs are described in
“Front panel port and LEDs”
(page 4)
NOTE:
Allow sufficient time for the controller to start up, or you will receive an error message.
Verifying the controller is installed correctly
9