2-4
Installing the Switch
Installation Procedure
In
sta
llin
g
th
e
Sw
itc
h
Installation Space Requirements
2. Verify the Switch Passes Self Test
Before mounting the switch, verify it is working properly by plugging it into a
power source and confirming that it passes self test.
N o t e
The switch does not have a power switch. It is powered on when the power
cord is connected to the switch and to a power source. For safety, the power
outlet should be located near the switch installation.
The switch automatically adjusts to any voltage between 100-127 volts for 0.75
amps, 200-240 volts for 0.4 amps, and either 50 or 60 Hz. No voltage range
settings are required.
If your installation requires a different power cord than the one supplied with
the switch, be sure to use a power cord displaying the mark of the safety
agency that defines the regulations for power cords in your country. The mark
is your assurance that the power cord can be used safely with the switch.
1.
Connect the power cord supplied with the switch to the power socket on
the back of the switch, and then into a properly grounded electrical outlet.
Switch
Orientation
Clearance Requirements
Front
At least 7.6 cm (3 inches) of space for the twisted-pair and fiber-optic
cabling.
Back
At least 3.8 cm (1 1/2 inches) of space for the power cord and switch cooling.
Sides
At least 7.6 cm (3 inches) for cooling, except if the switch is installed in an
open EIA/TIA rack.
Connect power cord to
the power socket
Summary of Contents for ProCurve 1400-24G
Page 1: ...Installation and Getting Started Guide www procurve com ProCurve Switch 1400 24G ...
Page 2: ......
Page 3: ...ProCurve Switch 1400 24G Installation and Getting Started Guide ...
Page 10: ......
Page 26: ......
Page 40: ......
Page 47: ......