5
Site preparation checklist
Complete the following address information, contact information, and checklist. If a checklist item cannot be
completed or is unnecessary, add a short explanation under ‘Comments’. Once you have completed the
checklist, sign it and send it to your reseller or HP sales representative a minimum of two weeks before the
delivery date.
NOTE:
Some checklist items are marked ‘(Required)’, which means that you cannot proceed with installation
until you have checked the ‘Yes’ box.
When you sign this document, you are confirming that the site has been prepared according to the specifications
provided in the site preparation guide, that all checklist items have been completed, and that the site is prepared
and ready for delivery and installation.
Address information
Company name
Postal code
Street address
Telephone
City
Fax
Country
3D Center by PrintOS information
User’s first name
Account name
User’s last name
User’s email address
Contact persons
Name
Telephone
Company owner or EHS manager
Company engineer or technician
System administrator
Operators to be trained in the use and
maintenance of the system
48
Chapter 5 Site preparation checklist
ENWW