Chapter 2
Installing the System
Standalone and To-Be-Racked Systems
43
Standalone and To-Be-Racked Systems
Servers shipped in a stand-alone or to-be-racked configuration must have the core I/O handles and the PCI
towel bars attached at system installation. Obtain and install the core I/O handles and PCI towel bars from
the accessory kit A6093-04046. The towel bars and handles are the same part. Refer to service note
A6093A-11. This is the same accessory kit used for the HP 9000 rp8400 server.
Rack-Mount System Installation
Information is available to help with rack-mounting the server. This list is intended to guide the HP
Installation Specialist to the documentation that has been written by the Rack and Power team.
The external Web site is: http://www.hp.com/racksolutions
The internal Web site is:
http://h18004.www1.hp.com/products/servers/proliantstorage/bcs-rackandpower/index.html
The web site is organized into the following topics:
Racks & Accessories
•
Rack System/E
•
Rack accessories
•
Universal mounting kits
Power Management
•
PDUs
•
Cordsets
•
Rackmounted UPS
System Management
•
Console switches
•
Flat panel/keyboards
Data cables
•
CAT 5 cables
•
Fibre optic cables
•
SCSI cables
•
SCSI terminators
Summary of Contents for Integrity rx8640
Page 6: ...Tables 6 ...