SOP
Document No. : Empire FA Dis-assembly SOP
Station :
Operation Des : Ver. :
Date
:
Fixture list
Qty
Fixture list
Qty
Step
:
Attention
︰
Pls inform the OP assistant immediately once there is any abnormal
Editor
:
Publish
:
Zhu Ya
IE
1.Disassemble SSD shielding(
6053B1667801) and SSD mylar(6054B1547701),and recycle
2. Take out SSD&WWAN screw M2 x 2L (
6052B0156201
)*2
Twisting force value
:
1.5
±
0.1Kgf
.
cm
Make sure the screw can’t loose
,
can’t be dropped into the units
3. Disassemble SSD and WWAN
,
recycle them
13(1/1)
Disassemble the SSD and WWAN
Picture 1
Picture 2
Picture 3
2019/8/20
1.00