SOP
Document No. : Empire FA Dis-assembly SOP
Station :
Operation Des : Ver. :
Date
:
Fixture list
Qty
Fixture list
Qty
Step
:
Attention
︰
Pls inform the OP assistant immediately once there is any abnormal
Editor
:
Publish
:
Zhu Ya
IE
Disassemble shielding
,
Remove WWAN cable
6(1/1)
1.Disassemble MB ZIF Shielding(6053B1667501)&WWAN ZIF shielding(6053B1668101) ,and
Recycle them
2.Follow the arrow
,
Disassemble the WWAN cable until the MB location
MB ZIF Shielding
6053B1667501
WWAN ZIF Shielding
6053B1668101
FOR WWAN model
Disassemble point
Disassemble point
2019/8/20
1.00