
System Upgrade
2-11
Figure 2– 5 Cable Connections-2
4
5
PK3222
12. Connect the global port cables of the upper and lower drawers
to the
distribution board. Attach the plastic shield to cable B0 before plugging in
its connector. Then, fold the shield up to protect the global port cables from
the metal flanges.
13. Put the two covers on the distribution board assembly. Insert the tabs of
the distribution board assembly covers through the chassis slots, close the
covers, and fasten them to the chassis
with screws
.
(see Figure 2–7).
14. In the upper drawer, reinstall the CPU and memory modules. Next,
reattach the drawer cover and push both drawers into the cabinet. Fasten
them with the screws.
Summary of Contents for AlphaServer GS80
Page 4: ......
Page 8: ......
Page 29: ...System Upgrade 2 13 Figure 2 7 Cable Connections 4 FOLD 9 PK3224 10 ...
Page 32: ......
Page 48: ......