Table 7. DLCI Status bits returned in “Status” message
Bit
Value
Description
New
0
PVC is already present
New
1
PVC is new
Active
0
PVC is inactive (PVC is deleted)
Acitve
1
PVC is active
Figure 5 shows four routers attached to a Frame Relay network. Each router
has a PVC to each of the other routers on the network. Assume that R1 is the
first to initialize (power on) and become active on the network. The first
message that R1 sends to the Frame Relay network is a full status poll. This
indicates to the network that the router and the link to the router are now
functioning. The network returns a full status reply. This status reply,
however, contains an empty list of DLCIs (no DLCIs and accompanying
status information). This is because none of the other routers are yet active.
Figure 5. PVCs Connecting Routers
Now, let’s suppose that R2 powers on, and its Frame Relay interface is
initialized and enabled. Like R1, the first message it sends to the network is a
full status poll. As before, the network responds with a full status reply. This
time, however, the list of DLCIs is not empty. The full status reply contains
DLCI 133 and indicates that it is both new and active (see table 7). This
indicates to R2 that it may now communicate using DLCI 133 (to R1). At this
instant, however, R1 still has no active DLCIs and is not able to communi-
cate with R2. This situation is resolved after R1 sends its next full status poll
A
p
p
li
c
a
ti
o
n
N
o
te
s
/
C
a
s
e
S
tu
d
ie
s
3
Linking Up with Frame Relay
Local Management Interface
3-99
Summary of Contents for 600 Series
Page 1: ...Hewlett Packard Series 200 400 and 600 Routers HP Routing Services and Applications ...
Page 4: ......
Page 5: ...1 Product Notes ...
Page 6: ...Features of HP Routers Architecture and Technology Branch Office Routing Product Notes 1 2 ...
Page 38: ...Architecture and Technology Software Control Path Architecture 1 34 ...
Page 52: ...Branch Office Routing Future Directions 1 48 ...
Page 53: ...2 Routing Services Notes ...
Page 106: ...Bridging Service Traffic Prioritization 2 54 ...
Page 158: ...Novell IPX Routing Service NetBIOS Protocol Support 2 106 ...
Page 194: ...Data Compression for WAN Links Conclusion 2 142 ...
Page 195: ...3 Application Notes and Case Studies ...
Page 224: ...Improving Network Availability Application Recovery 3 30 ...
Page 234: ...ISDN Wide Area Network Design Dry Creek Joint Elem School District Performance 3 40 ...
Page 316: ......