background image

13.Tighten all 12 screws used to

attach the legs, clock dial
assembly, and base rings.

15.Place the glass top on the rubber

pads, centered on the base.

10.Use the same procedure in steps

7, 8, and 9 to attach the fourth leg.

11.Align the holes in large base ring

with the holes in the legs. Using
the long screws attach the ring to
the legs.

12.Align the holes in small base ring

with the holes in the legs. Using
the long screws attach the ring to
the legs.

Note: The holes in the ring may not align perfectly with the holes in the legs and you
may need to apply moderate force to the ring or leg in order to start the screws.

©Copyright 2001 Howard Miller Clock Company

PD10063-R2

10/10

14.Turn the assembled base over so

that the dial is facing up. Attach
the rubber pads over the screw
holes in the outer ring of the base.

RUBBER PAD

Reviews: