Check the neutralisation system (where
installed, see page 1)

Before commissioning the granulate
container is to be filled with the neutralising
granulate NEUTRALAT, as described.

Once a year or after consumption (dissolving) the
neutralisation system should be thoroughly cleaned,
i.e. rinsed with water. To clean the neutralisation
system please follow the instruction below.

Maintenance and checks

Maintenance and checks

The work operations described below are
normally carried out by the specialist at
the time of the annual maintenance.
However, carry out the following checks
in the course of the year and where
necessary, carry out the work described.

Checking the water level
If the system water pressure is low (read
from the pressure gauge), notify your
installer or refill with water.

Refilling the heating system

• Set the main SYSTEM switch to ”0”.
• The shut-off valves for the heating feed and return

must be open.

• The boiler filling and draining cock is accessible after

removing the front cover at the front of the boiler.

• Connect the filling cock to the water tap by a hose;

unscrew this after filling, to safely break the
connection.

• Note the water quality: Drinking water quality; the pH

value must not exceed 9.5.

• Fill with water slowly, check the water level at the

hydrometer or pressure gauge.

• Keep the bleed valves on the radiators open until air-

free water flows out.

• No chemical additives (inhibitors) or anti-freeze

agents are to be used in the boiler circuit.

Attention:
Never add cold water to the hot
heating system.

1. Take off the bottom front boiler cover (remove 2

screws) (on the UG-AM-c (200-350) take off the
bottom cover at the side.

2. Disconnect any condensate connectors (see page

1 for model without condensate lifting pump)

3. Pull out the granulate container.

4. Dispose of any residual granulate with the domestic

waste.

5. Clean the neutralisation system carefully, i.e. flush

out with water.

6. Fill up with new granulate.

The following quantities are required:
- For the UG-AM-c (50-150) – 9 kg of granulate

(3 bags)

- For the UG-AM-c (200-350) – 12 kg of granulate

(bags)

After removing the first wrapper, shake out the fine
dust resulting from transport. Then place the
granulate on the grid, respectively on the filter mat
of the granulate container and distribute it evenly.

7. Push the granulate container back in.
8. Reconnect the condensate connection.
9. Replace the boiler front cover (UG-AM-c (200-350)

bottom cover at the side).

Summary of Contents for UltraGas AM condens (50-350)

Page 1: ...Liquid gas Heating pump type Heating controller type Mixer type Separate calorifier type Calorifier sensor Thermostat Outside temperature sensor Room temperatur sensor Combustion air supply Room Outs...

Page 2: ...operation of your Hoval UltraGasAMcondens allapplicablelaws regulations and standards must be complied with in particular the regulations of the responsible energy supply authorities In the case of qu...

Page 3: ...eating controller If the boiler is also used for water heating it remains switched on for the whole year Fuel The boiler is only to be operated with the type of gas stated on the rating plate Settings...

Page 4: ...e reset button on the boiler control panel If this is not successful please close the gas cock and call your after sales service or heating installer Absolutely imperative Fault freefunctionisonlyguar...

Page 5: ...ed boiler temperature at the boiler temperature controller Please refer to the section Faults on page 4 if fault lamps light Placing out of operation Place the main SYSTEM switch to 0 Close the gas sh...

Page 6: ...ng nor mal Check 6 3A fuse if all displays remain dark Controls the internal boiler functions Settings and changes are only to be made by the heating specialist The indication flashes if a fault is pr...

Page 7: ...ting Automatic control corresponding to the switching times entered for the 3 nd program longer operating time The room temperature is not reduced in the night Hot water according to clock program 2 S...

Page 8: ...to safely break the connection Note the water quality Drinking water quality the pH value must not exceed 9 5 Fill with water slowly check the water level at the hydrometer or pressure gauge Keep the...

Page 9: ...urn open Is the main switch in the Changeover 6 OFF position Is the clock of the TopTronic Carry out check according to the separate operating correctly set instructions for the heating controller Che...

Page 10: ...oors and windows closed in the winter Close flue flaps when the fire is out Use kitchen and bathroom fans only when steam and odours have to be extracted Ventilate for short periods but frequently Sea...

Page 11: ...d set up for optimal operation Any repairs will be carried out at once with your agreement Amaintenancecontractcarriesawiderange of benefits Your guarantee period is extended when you take out a maint...

Page 12: ...p Tel 031 818 66 30 Fax 031 818 66 31 kc bern hoval ch Z rich Postfach 8706 Feldmeilen Tel 0848 81 19 30 Fax 0848 81 19 31 kc zuerich hoval ch Zentralschweiz Postfach 8706 Feldmeilen Tel 0848 81 19 40...

Reviews: