4 210 266 / 03
7
Assembly
4. Using a winch (4, fig. 3) raise the front of the boi-
ler and remove the front crossbeam (5).
6
Fig. 4
5. Push the lateral bars (4, fig. 4) out on the front
and lower the boiler back onto the floor.
7 8
Fig. 5
6. Remove screws (3, fig. 2) at the back
.
Lift rear
wall and cover and take off the rear wall towards
the bottom. Using a winch (7, fig. 5) raise the
boiler at the back in the centre (8) and remove
crossbeam and side beams. Lower the boiler
back onto the floor.
7. Affix the enclosed type sticker visibly on the boi-
ler.
3.
Assembly
3.1 Placement
i
Hoval recommends the Installation of the heat-
ing boiler on a foundation plate.
Fig. 1
1
1. Remove wooden crate (1, fig. 1)
Caution: sharp edges (Figure 2)!
Fig. 2
3
2
2. Remove transportation straps (2, fig. 2)
3. Remove
front screws (3)
Fig. 3
4
5