Variant 3: vertical unit
■
Install the retaining brackets
3
on the unit:
– Attach the retainer covers
1
onto the retaining brackets.
– Fasten the retaining brackets with the M8 screws
2
onto the unit.
■
Install the unit on the wall.
– Use the packaging box as a drilling template.
■
1
Retainer cover
■
2
M8x70 screw with washer (not included in
the scope of delivery)
■
3
Retaining bracket
Fig. 10: Vertical installation
12
TopVent
®
TW
Design, installation and operation
Transport and installation
4 216 285-en-02