8.4 Installation
Caution
Risk of injury caused by falling load and improper handling. During
installation:
– Wear personal protective equipment.
– Do not stand under suspended loads.
– Use cranes or forklifts with sufficient load-bearing capacity.
Preparation
■
Make sure that a lifting platform is available.
■
Remove the packaging film.
■
For mounting, use the enclosed rivet nuts and
– the optionally available suspension set or
–
flat irons, perforated irons, angle profiles, steel cables or similar.
Installation
■
Transport the unit to the installation site.
■
Mount the suspension set on the designated suspension points.
Caution
Risk of injury from falling parts. Only fasten the unit at the designated
suspension points. Do not place any suspension points on the filter box,
mixed air box or recirculation silencer.
■
Rotate the unit to the correct position (position of the coil connections).
■
Attach the unit to the ceiling.
■
Install the device horizontally.
■
Do not attach any additional loads.
■
Do not use eyebolts.
■
Non-vertical suspensions are permissible up to a maximum angle of 45°.
■
TopVent
®
MH, MC, MHC:
– Connect supply air units to the fresh air duct via a canvas connection and
connect both flanges with an earth wire.
Fig. 18: TopVent
®
THC installation
Fig. 19: TopVent
®
MHC installation
≤
45°
≤
45°
Fig. 20: Non-vertical suspension
26
27
TopVent
®
TH | TC | THC | MH | MC | MHC
Operating instructions
Transport and installation
Transport and installation
4 218 828-en-01
Summary of Contents for TopVent MC-6-C
Page 39: ...39...