Installing the below-roof unit
■
Apply sealing compound to the roof frame.
■
Screw in the transport eyes into the connection module frame and attach the
lifting gear.
–
Heed the minimum length of the lifting ropes (see Fig. 19).
■
Transport the below-roof unit to the roof frame using a helicopter or crane.
■
Turn the below-roof unit to the desired position.
■
Hang the below-roof unit into the roof frame from above.
■
Check the sealing strip on the connection module flange. Improve the seal if
necessary.
■
Remove the transport eyes.
Fig. 20: Applying sealing compound to the roof frame
Fig. 21:
Hanging the below-roof unit
min. 2 m
Fig. 19: Minimum length of the lifting ropes
26
RoofVent
®
KG
Operating instructions
Transport and installation
4 220 755-en-00