23
Operations
Check List Before Starting
CAUTION! If “NO” has been checked on any of the
following sixteen questions, do not operate this
machine
.
ATTENTION:
Si la réponse à l'une des questions ci-
dessus est « NON », ne pas utiliser la machine
YES
NO
Has gas supply been inspected by an
authorized contractor to meet local
codes?
Is machine protected from downdraft and
excessive wind?
Is machine shielded from moisture or
water spray?
Is the voltage correct and are the circuit
breaker and supply cord adequate
according to specifications and serial
plate notation?
Is the machine electrically grounded?
Is there ample water supply?
Have all flammable liquids or gases been
removed from installation location?
Is there adequate gas supply for the BTU
rating of the burner?
"Is incoming gas supply pressure
between 6" - 14" water column inches or
1/2 PSIG?"
Has the proper gas regulator been
installed for pressure and volume?
Have you installed the optional LP
gas regulator assembly 9.802-633.0?
Is the machine properly vented to
allow adequate air flow?
Are the propane tanks large enough,
according to rating to prevent freezing?
Have gas lines been checked for gas
leaks?
Have gas lines been checked with local
codes?
Have all operators using this machine
been instructed properly and have they
read the manual?
Has the machine been installed
according to operator's manual
instructions?
MANUAL, OPERATOR, HOTSY, STAT ELEC NG-LP 9.808-037.0-A