33
HOSHIZAKI EUROPE
B.V.
4)
Probes and inlet/outlet pipes which
connected with Evaporator must cover
by PVC insulation tape and make sure all
these elements adjust properly.
5) Make sure the sensor position is right
and suitable and drain path must be
checked.
6) There must be sheet plate under
the Defrost Heater to prevent plastic
surface from melting.
7) Make sure the sensor is correctly
positioned and drain path is checked.
8) After fitting the evaporator box secure
the belts and do not overtighten. Make
sure there are no gaps around the base
of the box.
9) Make sure the pipe and cable
entry point is fully sealed with putty.
10)
Vacuum Breaker must be sealed by putty on Freezer Cabinets, it must be also
checked by service technicians!
11) When the positioning is done the
dryer mustn’t touch with any
surface.
Summary of Contents for PREMIER 60
Page 39: ...39 HOSHIZAKI EUROPE B V PREMIER K 70 PREMIER M 70 PREMIER F 70 17 Dimensions...
Page 40: ...40 HOSHIZAKI EUROPE B V PREMIER KG 70...
Page 41: ...41 HOSHIZAKI EUROPE B V PREMIER K W80 PREMIER M W80 PREMIER F W80...
Page 42: ...42 HOSHIZAKI EUROPE B V PREMIER KG W80...
Page 43: ...43 HOSHIZAKI EUROPE B V PREMIER K 60 PREMIER M 60 PREMIER F 60...
Page 44: ...44 HOSHIZAKI EUROPE B V PREMIER KG 60...
Page 46: ...46 HOSHIZAKI EUROPE B V ELECTRICAL WIRING DIAGRAM FOR CABINET FREEZER MODELS...