43
Packing
Screws
Bracket
Float Switch
4) Remove the two mounting screws, and release the
float switch from the tabs on the bracket.
5) Install the new float switch in the reverse order of the
removal procedure.
6) Refit the panels in their correct positions.
7) Turn on the power supply.
16. BIN CONTROL SWITCH
CAUTION
Do not drop or impact the bin control switch. The reed switch inside may be damaged.
1) Remove the water tank. See "V. 14. WATER TANK."
2) Disconnect the connector of the bin control switch lead (black).
3) Pull out the bin control switch tab outside and slide the bin control switch towards you.
4) Take out the bin control.
5) Install the new bin control switch.
6) Route the bin control lead through the hole in the base, then into the bushing provided.
Bin Control Switch Tab