8
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
Legend:
AMD
–actuator motor down
AMPS
–actuator motor position sensor
AMU
–actuator motor up
BC
–bin control
CBTh
–control board thermistor
Comp
–compressor
ET
–evaporator thermistor
1. Bin Full
Shutdown
and Restart
BC Operation
BC
open 10 sec. or more (BC actuator
paddle engaged). Shutdown occurs at
end of harvest cycle.
All components
de-energized.
2. Icemaker Off
3. Ice Level Lowered
BC
closed 80 sec. or more
(BC actuator paddle
disengaged).
Shutdown and Restart Sequence Flow Chart
Operation Flow Chart
1. 30-Sec.
Startup
Cycle
Cycle
Steps
2. Harvest Cycle
• HGV: If CBTh≤81°F (27°C) (CB Setting 74),
HGV repeatedly energizes 40 sec./
de-energizes 40 sec.
• FM: If CBTh≥118°F (48°C) (CB Setting 34),
FM operates continuously in harvest cycle
• Max. harvest time: 30 min.
3. Freeze Cycle
• Max. freeze time: 45 min. (CB Setting 6)
HGV
energized
HGV
continues
AMD
energized
Comp
energized
Startup
WV
energized *2
Comp
continues
AMU
energized
FM
energized
HGV
de-energized
Water Tank Open (ET)
ET≥41°F (5°C)
(CB Setting 1)
PM
energized
Comp
continues
FM
continues
WV
energized *4+*5
Water Tank Closed (AMPS)
If CBTh>81°F (27°C) (CB
Setting 74) and CBTh≤111°F
(44°C) (CB Setting 70),
HGV
energizes 5 sec./
de-energizes 25 sec./energizes
5 sec. (CB Setting 71, 72)
ET≤-1.3°F (-18.5°C)
(CB Setting 2)
Note
CB
Setting
Power On-Startup
Initial Harvest and
Initial Freeze
Bin Control-Startup
Initial Harvest and Initial Freeze after
Bin Control Initiated Restart
Normal Harvest and Freeze
All WT
WT>48°F (9°C)
WT≤48°F (9°C) WT>48°F (9°C) WT≤48°F (9°C)
*1 NA
20 sec.
0 sec.
0 sec.
20 sec.
20 sec.
*2 10
WT < 48
°
F (9
°
C)
95 sec.
10 sec. (CB Setting NA) 95 sec.
30 sec.
95 sec.
11
WT > 48
°
F (9
°
C)
30 sec.
*3 NA
0 sec.
0 sec.
10 sec.
0 sec.
10 sec.
PD
*4 12
30 sec.
× 2
30 sec.
× 2
30 sec.
× 2
30 sec.
30 sec.
PD
*5 15
22 sec.
× 2
22 sec.
× 2
22 sec.
× 2
22 sec.
22 sec.
FD
*4 12
60 sec.
60 sec.
60 sec.
60 sec.
60 sec.
FD
*5 15
44 sec.
44 sec.
44 sec.
44 sec.
44 sec.
Time varies based on
control board calculation
FD
–full drain (CB Setting 14)
FM
–fan motor
HGV
–hot gas valve
PD
–partial drain (CB Setting 14)
PM
–pump motor
WT
–water temperature
WV
–inlet water valve
Icemaker restarts at
1. 30-Sec. Startup Cycle.
WV
de-energized
WV
de-energized
30 sec.
*1
WV 20 sec.
Delay
PM off
Delay *4