ENGLISH
2
1. UNPACKING
WARNING
Children should not be allowed in reach of
the packaging elements (plastic bags and
expanded polystyrene) as they are potential
sources of danger.
CAUTION
1. Do not lift or manoeuvre the carton by
using the shipping bands.
2. Remove shipping carton, tape(s) and
packing. If packing material is left in the
icemaker, it will not work properly.
Note: 1. This icemaker needs a storage bin.
T h e r e c o m m e n d e d s t o r a g e b i n i s
HOSHIZAKI ICE STORAGE BIN, model
B-300SD(PD) or B-500SD(PD) with top kit
- 8C, B-700SD(PD) with top kit - 22C, or
B-900SD(PD) with top kit - 22C and top kit
- 8C.
2. This icemaker is designed to be connected
to a central cooling system using R744.
1) After removing the packaging, make sure that
the icemaker and the storage bin are in good
condition. If in doubt, please do not use the
equipment but apply to professionally qualified
personnel. See the instruction sheet attached to
the storage bin for its unpacking and installation
guidelines.
2) Remove the shipping tape holding the panels.
Top Panel: Remove the screw(s). Lift off.
Front Panel: Remove the screw. Lift up and pull
toward you.
Side Panel: Remove the screw. Pull slightly
toward you, and lift off.
Top Panel
Side Panel
Front Panel
4) Remove the package of accessories, and check
the contents:
CD 1
Mounting Bracket
2
Power Supply Cord
1
Inlet Hose
1 (FM-600, 1200)
2 (FM-1800)
Outlet Hose
1 (FM-600, 1200)
2 (FM-1800)
Connector Cover
1
5) Remove the protective plastic film from the
panels. If the icemaker is exposed to the sun or
to heat, remove the film after the icemaker cools.
2. LOCATION
IMPORTANT
1. This icemaker is not intended for outdoor
use. Normal operating ambient temperature
should be within 5°C to 40°C. Water
connection is cold water only. Operation of
the icemaker, for extended periods, outside
of these normal temperature ranges may
affect production capacity.
2. The icemaker should not be located next to
ovens, grills or other high heat producing
equipment.
3. The location should provide a firm and level
foundation for the equipment.
4. Allow 15 cm clearance at rear and sides
for proper air circulation and ease of
maintenance and/or service should they be
required. Allow 60 cm clearance on top to
allow for removal of the auger.
Fig. 1
Power Supply Cord
Top Panel
Operation Panel
Front Panel
3) Remove the front, top and side panels. See Fig.
2.
Fig. 2