background image

CHCF25 & CHCF30 Included Parts

2 - 18' reach tubes

1 - 213" bottom rail
    (4" x 6" HSS)

1 - 25' or 30' top rail OR
    
(optional 30' split top rail)

1 - safety chain

4 - 6 bolt rims
     & tires
(size varies)

4 - 

1
2

" top rail U-bolts

4 - 

5
8

" bottom rail U-bolts

4 - 

5
8

" x 7" drawpins

4 - 

5
8

" x 6" bolts

4 - 

5
8

" x 4 

1
2

" bolts

8 - 

5
8

" x 1 

1
2

" carriage bolts

8 - 

1
2

" x 1 

1
2

" bolts

24 - 

5
8

" locknuts

16 - 

1
2

" locknuts

8 - 

5
8

" flat washer

4 - #9 hitch pins

2 - diagonal 
     braces

2 - vertical adjuster
     brackets
 

2 - top rail mount
     brackets
 

2 - tie down brackets

2 - adjustable shoe
     assemblies

4 - 

3
4

" x 11" pins

Bolt List

2 - 2" x 52" nylon straps

Front Axle

Rear Axle

6 - 

1
2

" top rail U-bolts

12 - 

1
2

" locknuts

1 - 207" axle joiner tie rod

Additional components for
"30ft. split top rail" option

 

1 left & 1 right - tie rod end

1 - CHCF tongue assembly

1 - Double Spring
     Balancer Kit

2 - Ratchet Assemblies

- 1 -

Summary of Contents for CHCF25

Page 1: ...BLY MANUAL CHCF25 CHCF30 4 Wheel Steer Combine Header Carrier HORST WAGONS 8082 Rd 129 Listowel ON N4W 3G9 Canada 519 291 4162 1 866 567 4162 Fax 1 519 291 5388 sales horstwelding com www horstwelding...

Page 2: ...TABLE OF CONTENTS CHCF25 CHCF30 Included Parts 2 Step by Step Assembly Instructions 3 4 Adjustable Shoe Assembly Instructions 5 9 Spring Tongue Balancer 10 Light Bracket Installation 11...

Page 3: ...lts 8 1 2 x 1 1 2 bolts 24 5 8 locknuts 16 1 2 locknuts 8 5 8 flat washer 4 9 hitch pins 2 diagonal braces 2 vertical adjuster brackets 2 top rail mount brackets 2 tie down brackets 2 adjustable shoe...

Page 4: ...agram on pg 9 for double spring tongue balancer installation D Align front rear steering see Wheel Alignment notes Insert reach tube secure with 5 8 x 4 1 2 bolt locknut using last hole in reach tube...

Page 5: ...brackets and start 1 2 U bolts locknuts Before tightening top rail must be centered from front to back B Mount adjustable shoes on bottom rail tube see step 5 6 for detailed shoe assembly instruction...

Page 6: ...ombines with low lifting clearance Follow these instructions for set up Step A Remove pins Step B Remove pad assembly Step C Locate base pad on header carrier bottom rail to desired position Step 5 A...

Page 7: ...pad for draper heads Follow these instructions for set up Step D Locate pad on header carrier bottom rail to desired position Step A Remove pins and clips Step B Swing 2 corn head plates 180 Step C Re...

Page 8: ...r set up Step A Remove pins and clips Step D Locate pad on header carrier bottom rail to desired position Step B Swing 2 corn head plates and large pad assembly 180 and reinstall longer pin and clip S...

Page 9: ...orm Follow these instructions for set up Step B Swing 2 corn head plates and large pad assembly 180 Step C Position back extension here and reinstall longer pin and clip Step D Reinstall shorter pin a...

Page 10: ...t up Step A Remove pins and clips Step B Swing large pad assembly 180 Step C Position back extension here and reinstall longer pin and clip Step D Position corn head plates and reinstall shorter pin a...

Page 11: ...ount 22 1513 1 4 5 8 x 1 1 2 Bolt Nut Lockwasher 11 1517 3 5 Double Spring Balancer Plate 22 1514 2 6 Double Spring Tongue Balancer Kit Included Parts Assembly Instructions 5 6 2 1 5 6 3 5 3 1 2 4 Bol...

Page 12: ...ts Light Kit Installation optional A Secure mounting brackets illustrated below B Run wire lead forward on outside of reach tube and along side of tongue through loop Secure exposed wire using wire cl...

Reviews: