background image

www.hornbach.de

18.01.17

4

Please note the structural data and concrete quality required for the foundations.  

Post anchors and bolts are not provided in the delivered contents.

1) Foundation

The surface of the building site should be level. Begin by excavating the holes  

for the post footings according to the dimensions given in the foundation plan below.  

It is extremely important that the foundations are positioned at right angles.

Tip!

 

Use a wooden stake to mark the location of a post. Then mark out a right  

angle from that corner. If the diagonal measured between sides that are exactly  

4m and 3m long equals exactly 5m, you have created a right angle.  

As an alternative method, it is possible to verify that you have a right angle  

using the dimensions given below.

2) Posts and girders

It is now possible to attach the posts to the girders. First lay the girders on the 

ground and arrange the posts as specified in the plan. Use a screw clamp to 

attach the posts to the girder and then drill through both components using a 

7mm wood drill bit. Use the machine screws to connect the girder and posts. 

Now pre-drill for the post anchors and attach them to the posts. Use roof 

battens to reinforce the construction (drawing 1). 

Erect the completed side sections and position them in the footings. Brace the 

side sections and align the entire unit (drawing 1)

Warning: Position the posts with the splice joint facing inwards

3)

After both side sections have been erected, position the entire construction as 

shown in drawing 3. Align the carport from the front to the back with a 1% 

slope (see plan drawing on the last page).

Now it is possible to pour the concrete footings. 

Smooth the surface of the footings to gently slope outwards. This allows for 

better drainage of rainwater.

After verifying the dimensions, it is possible to pour the concrete foundations.

4) Girders, rafters and diagonal supports

Place the rafters on the girders as shown in the drawing and connect them 

using the Rafter anchors. If the rafters are slightly bowed, place the rafter so 

that it arches upwards and position it as far forward as possible. 

5)

Install the diagonal supports transversely on every post (see plan drawing 

on the last page).

6) Roof panels

After all of the rafters have been attached, install the roof panels. Make sure 

to install the panels from the back to the front. First distribute the roof panels 

on the rafters so that they fit across the breadth and then over the length 

of the carport. It is essential to distribute and align all of the panels before 

screwing down the panels! The distance from the edge fascia should amount 

to at least 5mm.

Attach every roof panel using at least 4 spacers and screws per rafter. Our 

hardware system makes it possible complete the assembly without help from 

a third party.

Warning:

only walk on the panels using planks to distribute the weight.

It is necessary to observe the information provided on the first page.

7)

Step 1:

Drill through the roof panel at a slow speed using a 10mm wood drill bit. 

Make sure that the drill is horizontal and centred. Drilling at an unsuitable 

speed can break the panel.

Step 2:

Place the plastic spacer in the hole. Place the screw bit directly in the spacer 

to drive it through the panel.

Step 3:

Verify the correct positioning of the spacer. The roof panel must be resting 

on the spacer.

Step 4:

Now securely screw the roof panel to the rafter. Make sure to drive the screw 

straight through the panel. Otherwise leakage may occur.

Step 5:

Do not over-tighten the screw, as this may damage the roof panel.

8) Fascia boards

Begin with the front fascia board. Install the front fascia board to project by 

2cm beyond the rafters on both the left and right sides.

Attach the fascia boards on the sides using Phillips-head screws in the 

ends of the rafters (please pre-drill).

The fascia boards should project beyond the roof panels by 0.5cm.

Special Offer Carport (GB)

Assembly Instructions
Hornbach item no. 7452156; manufacturer item no. 60175101

Page 14

Page 15

Page 15/16

Page 17

Page 18

Page 18

Page 19

Summary of Contents for 60175101

Page 1: ...entemperatur von 10 C verlegt werden und nicht im Stapel gelagert werden da sich sonst die Platten verformen k nnen die maximale Temperatur darf im Stapel 45 C nicht berschreiten Bei montagebedingter...

Page 2: ...etoniert werden Seite 15 16 4 Tragbalken Sparren und Diastreben Legen Sie die Sparren laut Grundriss auf die Tragbalken und befestigen Sie diese mit den Sparrenpfettenankern Sollten die Sparren einen...

Page 3: ...installed when the temperature outdoors is 10 C or above Do not store the panels in a stack as this may cause deformation The maximum temperature of the stack may not exceed 45 C If it is necessary to...

Page 4: ...in the drawing and connect them using the Rafter anchors If the rafters are slightly bowed place the rafter so that it arches upwards and position it as far forward as possible 5 Install the diagonal...

Page 5: ...l d ny jen p i teplot vy ne li 10 C a nesm b t skladov ny na sob nebo m e jinak doj t k jejich deformaci Maxim ln povolen teplota desek je 45 C P i manipulaci s deskami mus b t p i mont i pou ity fo n...

Page 6: ...a Pokud by vzp ry byly prohnuty do oblouku polo te je na tr my tak aby prohnut sm rovalo vzh ru a pokud mo no kup edu 5 Diagon ln vzp ry zabudujte na ka d sloup v p n m sm ru viz pl nek na posledn str...

Page 7: ...polagati samo na vanjskoj temperaturi vi oj od 10 C i ne smiju se pohranjivati u slogovima jer se plo e u tom slu aju mogu deformirati maksimalna temperatura u slogovima ne smije biti vi a od 45 C Kod...

Page 8: ...luk postavite ih tako da luk pokazuje prema gore i polo ite ih toje mogu e vi e prema naprijed 5 Popre negredeugraditiuzsvakistupupopre nomsmjeru vidiplanskinacrtna posljednjoj stranici 6 Pokrov krova...

Page 9: ...Med monta o morate elemente prav tako za ititi pred vremenskimi vplivi in vetrom Important Aplicarea pl cilor de acoperi din PVC este permis numai la temperaturi exterioare de peste 10 C Ele nu vor f...

Page 10: ...m proiec iei de baz pe grinzile portante i fixa i i cu C prior ancor n cazul n care c priorii prezint o curbur dispune i i astfel nc t curbura s arate n sus plas ndu i totodat c t mai n fa 5 Contrav n...

Page 11: ...drugo ker se lahko plo e sicer deformirajo najvi ja temperatura pri nalo enih plo ah ne sme presegati 45 C e je zaradi monta e treba hoditi po plo ah je treba uporabiti deske za porazdelitev te e ker...

Page 12: ...ih pritrdite s pirovec sidro e so pirovci zviti jih polo ite tako da ka e lok navzgor in da so im bolj spredaj 5 Diagonalne opore se montirajo na vsak steber v pre ni smeri glejte skico na rta na zadn...

Page 13: ...www hornbach de 18 01 17 13 10 30 20 40 51 50 10 10 10 10 20 40 51 40 40 40 40 30...

Page 14: ...www hornbach de 18 01 17 14 80 cm 5 5 c m 55 cm 55 cm 200 cm 55 cm 310 cm 533 cm 134 cm 433 cm 134 cm 55 cm 55 cm 55 cm 1...

Page 15: ...www hornbach de 18 01 17 15 2 e M10 x 100 3 e...

Page 16: ...www hornbach de 18 01 17 16 3 245 cm...

Page 17: ...www hornbach de 18 01 17 17 c 4 5 5 c c c 4 x 45 b 3 5 x 25 a 35 x 35 x 170 b b...

Page 18: ...www hornbach de 18 01 17 18 1 2 3 4 5 7 6...

Page 19: ...www hornbach de 18 01 17 19 8 i 3 5 x 35 i i i...

Page 20: ...ungen Das Urheberrecht an dieser Zeichnung bleibt bei ante Haus und Garten Gmbh Co KG Die Zeichnung darf ohne unsere vorherige Genehmigung weder kopiert noch vervielf lltigt werden Holzart VPE St rke...

Reviews: