Design flow: 

1 Determine design purpose and design plan: determine the requirements 

and coverage target of a respective works based on the technical 
bidding documents of construction unit. Plan the scale of current works 
and design, determine the design contents and estimation plan after 
careful study of the reconnaissance and technical bidding documents. 

2 Formulate general frame of the plan: formulate general frame for design 

plan and determine the design direction based on the design plan and 
requirements for current works. 

3 Perfect designing contents; complete all the contents of the plan, such as 

design basis, panorama data analysis based on reconnaissance 
report. 

4 Analysis on feasibility and rationality of the plan: all plans must be 

analyzed in terms of technical feasibility and rationality such as 
prediction on the border magnetic field, switch analysis, interference 
analysis, balance analysis and so on. 

5 Quotation; rationally quote on the plan according to the market 

requirements after repeated examination of the feasibility of technical 
plan and verify the pricing of the plan after comparison. 

Key requirements for design:

 

1 Reinforce the analysis on the rationality of the plan 
2 Decide reasonable editing format and corresponding fonts according to 

the template of the design. 

3 Reinforce the analysis on pilot panorama testing. 
4 Use special drawing tools (Microsoft Visio) to draw the point location 

drawings and system frame. 

5 Hand signature shall be requested for places of signature. 

 

5.1.3 Organization of Construction

 

Purpose:

 according to statistics, the start or poor effect at the start of 

system after the completion of construction is usually caused by disorder in 
construction and management. Therefore, apart from strict execution 
according to the process provided in relevant documents, specific plan for 
construction of works must be formulated in light specific construction to 
strictly provide all flows, reinforce the management of site construction and 
practice liability system of each work for each individual. 

Organization structure 

1 The following structure can be adopted for organization to assure the 

 

 

 

33

Chief Engineer 

QC 

Engineering 

Supervisor 

Manager of 

Materials 

Security 

Inspector 

Project 

Coordinator 

Summary of Contents for GZF9003-V

Page 1: ...HX SM GZF9183 V RB 0 GZF9183 V GSM Frequency Shifting Repeater User s Manual September 2004 Version 00 00 01 ...

Page 2: ...f this documentation may be excerpted reproduced translated annotated or duplicated in any form or by any means without the prior written permission of WRI Hongxin Telecommunication Technologies Co Ltd Fiberhome Group Hongxin Co 88 Youkeyuan Rd HongshanDist Wuhan P R China Website http www wri com cn http www hxct com Post Code 430074 Customer Support Center 85 27 8769 4409 Fax 85 27 8769 2579 E m...

Page 3: ...office for the latest updating information of the product Notice 1 Based on users need the actual working frequency of WRI repeater is to be customized In this manual we provide the repeater with frequency 935 960MHz for downlink and 890 915MHz for uplink 2 Based on users need the power supply AC input voltage value provided by WRI is to be customized either In this manual we provide repeater with...

Page 4: ...ING PRINCIPLE TECHNICAL INDICES 6 2 1 Working Principle 6 2 2 Product Features 7 2 3 Technical Indices 10 2 3 1 Major Technical Indexes 10 2 3 2 Ambient Environment Condition 10 2 3 3 Power Supply Requirements 10 2 3 4 Mechanical Characteristics 11 2 3 5 Interfaces 11 3 SYSTEM COMPOSITION 12 3 1 RF Unit 12 3 1 1 Duplexer 12 3 1 2 PA 13 3 1 3 RFF1 2 50 Cable 14 3 2 M C 15 3 3 Power Supply Unit 16 ...

Page 5: ...customized 23 4 3 Testing Method Procedure 23 4 3 1 Maximum Output Power 23 4 3 2 Maximum Gain 24 4 3 3 Auto Level Control ALC 24 4 3 4 Gain Adjustment Range 25 4 3 5 Gain Adjustment Step Length Error 25 4 3 6 Ripple In Band 26 4 3 7 Voltage Standing Wave Ratio 26 4 3 8 Spurious Emission 27 4 3 9 Uplink SNR 27 4 3 10 Group Time Delay 28 4 3 11 Noise Figure 29 5 CONSTRUCTION PROCESS 30 5 1 Construc...

Page 6: ...V Repeater 43 5 6 Antenna Feeder Installation 50 5 6 1 Laying Cables 50 5 6 2 Installation of the Service Antenna Feeder 53 5 6 3 Making Joint 53 5 6 4 Precautions for Antenna Feeder Installation 54 5 7 Grounding Power Supply Connection 55 5 7 1 Equipment Grounding 55 5 7 2 Power Supply Connection 58 5 8 Installation of Embracing Pole Antenna Bracket for tower 59 6 SITE OPENING DEBUGGING 62 6 1 To...

Page 7: ...iv GZF9003 V Wireless Repeater User s Manual 7 SYSTEM MAINTENANCE 71 8 PRECAUTIONS 72 9 TRANSPORTATION STORAGE 73 9 1 Transportation 73 9 2 Storage 73 10 APPENDIX TERMS ABBREVIATIONS 74 ...

Page 8: ...tool to expand network coverage reduce network cost and realize network optimization Frequency Shifting Repeater of GSM mobile communications is meant to amplify communication signal extend network coverage to improve communication quality by amplifying some weak received signals and expanding the signal coverage and to distribute traffic load in various base stations with efficiency In the course...

Page 9: ...munications of excellent performances manufactured by Wuhan Hongxin Telecommunication Technologies Co Ltd the surplus capacity of networks can be re planned or re arranged so that the resources of networks will be used to their maximum The application of GZF9183 V repeater shall attract more traffic load with its short cycles immediate returned profits easy installation and savings of network reso...

Page 10: ...he Equipment 1 Use filter with high selectivity and low insertion loss and multi grade filter technology to enhance the isolation between uplink and downlink 2 No interference to the base station and other radio equipments with low noise for the system proper linearity and high power 3 Ensure normal working of the repeater under tough environment with automatic level control ALC function 4 Unique ...

Page 11: ...Shifting Repeater of GSM mobile communication See Repeater OMC Operation Instructions of WRI Hongxin Co Ltd attached separately for detailed operation information 1 4 Basic Principle GZF9183 V Frequency Shifting Repeater is one of WRI Hongxin series repeaters The style of network grouping of GSM Frequency Shifting Repeater is flexible and in variety according to the real situation The basic ways a...

Page 12: ...will send the signal to the remote unit The remote unit will shift the signal back to the original frequency and amplify it By the service antenna of remote repeater the amplified RF signal will be used to covering the dead zones Just as the figure 1 1 shown figure 1 1 The basic principle of Frequency Shifting Repeater 5 ...

Page 13: ...hat the signal will be filtrated by IF filter which has very high Q value At last it will be amplified again by the high power amplifier HPA After such a progress the power of the signal will reach 1W to 30W depending on the type of HPA In the uplink the progress of amplifying signal is very similar to the downlink just in different frequency From the input of donor antenna to the output of servic...

Page 14: ...nsparent and unblocked for adequate absorption of traffic And ensure the excellent performance of the RF links though proper allocation of the indices of the RF parts and the powerful optimization capability of the RF system And also make the integrated system have excellent GSM parameter features through analysis careful designing and strict control of such key parameters as noise characteristics...

Page 15: ...ed system is made of aluminum alloy and its surface is treated with advanced technique to ensure excellent EMC performance and anti corrosion performance the integrated GZF9183 V repeater is tightly sealed so that its anti rainfall strength is up to 3mm min GB4785 84 and its anti splash strength is up to 3m s water speed water tight rubber spacers service life 10 years are used between the bottom ...

Page 16: ...ezo resistor and is designed with 2 level protection so that it can absorb very high lightning strike energy as well as remove residual voltage satisfactorily The MTBF of the integrated system is not shorter than 60000 hours the MTTR of the integrated system is shorter than 30 minutes and the maintenance guarantee time is shorter than 24 hours The service life of the product is at least 10 years ...

Page 17: ... μs Group delay variation within any 100KHz 200ns 200ns Noise Figure 4 dB 4 dB VSWR 1 5 1 5 Gain adjustment range 45 dB 105 dB 45 dB 105 dB Gain adjustment step 1dB 1dB Table 2 3 1 Major technical indices of the GZF9183 V Repeater 2 3 2 Ambient Environment Condition Ambient temperature 25 C 55 C Storage temperature 40 C 85 C Relative humidity 95 Air Pressure 70 106kPa 2 3 3 Power Supply Requiremen...

Page 18: ...s IP65 standard and can be fixed to the wall or the installation pole with installation accessories The physical appearance of GZF9183 V Repeater is shown in Fig 2 3 4 GZF9183 V Fig 2 3 4 2 3 5 Interfaces Antenna interface N type connector Portable computer and wireless modem interface RS232 11 ...

Page 19: ...ntain filters in the downlink and uplink The filters in uplink reject the downlink band just as the downlink ones reject the uplink band So the uplink and downlink are isolated into independent channels There are two duplexers for one GZF9183 V repeater one is connected with donor antenna the other is connected with service antenna For the duplexer connected with donor antenna two coupler ports wi...

Page 20: ...ession 935MHz 70 dB 915MHz 70 dB 925MHz 30 dB 980MHz 30 dB 880MHz 30 dB 4 Group Time Delay 150ns Max in band 5 Ambient Temperature 40 70 6 Connector Type SMA Female 7 Ambient Humidity 95 Non condensing 3 1 2 PA Downlink PA 930MHz 960MHz ALC Auto Level Control 40W Output Power Amplifier Label HXPA945 30 40m01a 945 means downlink module 40 means max output power is 40 watt PA module in GZF9183 V is ...

Page 21: ...orking Temperature Range 40 70 Watertightness Rate IP 68 Electrical Specifications Impedance Ω 50 1 Max Work Frequency MHz 3000 RF Peak Voltage kV 1 39 Peak Rating Power kW 19 800 1000MHz 160dBc IMD3 1600 2000MHz 160dBc JB JBW 0 1000MHz 28 26 JB JBW Echo Ullage dB 1000 2000MHz 26 24 1000MHz 11 100 Attenuation dB m 2000MHz 17 100 1000Hz 0 71 Average Rating Power kW 2000Hz 0 48 ...

Page 22: ...ater User s Manual 3 2 M C Port23 Port48 Port232 M C Board OMC LNA NCS P A Power supply Unit Modem In the repeater the working flow procedure is shown above All the active modules are connected in serial line to M C board 15 ...

Page 23: ...tency 3 DC DC converting technology 4 Own interface to backup battery can control charge and discharge of backup battery 5 Over Voltage Protection Over Current Protection Over Temperature Protection Backup Battery Low Voltage Protection Structural Figure the input DC voltage is to be customized DC DC Module DC DC Converting Circuit 220V AC Battery DC DC Module Commutating Filtering Circuit 5V Outp...

Page 24: ...o appointed area Electrical Specifications Frequency Range 870 960MHz VSWR 1 5 Input Impedance 50Ω Gain 11 5dBi Polarization Type Horizontal or Vertical Beam width 1 2 Power Points 8 Max Power 500W Connector Type N Female 107dBm IMP3 Lightning Protection DC ground Mechanical Specifications Height 3m Weight 10kg Rated Wind Velocity 60m s Maximum Diameter φ52mm Diameter of installation pole Φ60 mm 1...

Page 25: ...ization Type Vertical 3dB Horizontal Beam width 65 3dB Vertical Beam width 30 16dB First Upper Side Lobe Suppression 20dB First Down Null Fill Front to Back Ratio 25dB Max Power 500W Connector Type N Female 107dBm IMD3 Lightning DC Ground Mechanical Specifications Dimension LXWH 260 250 40 mm Weight 0 5kg 0 09 m 2 Wind Loading Area Rated Wind Velocity 210km h Radiating Element Material Aluminum Al...

Page 26: ...ons Frequency Range 890 960MHz Band width 70 MHz VSWR 1 5 Input Impedance 50Ω Gain 17dBi Front to Back Ratio 14 5dB Polarization Type Vertical or Horizontal Beam width 49 Max Power 150W Lightning Protection DC Ground Connector Type N Female Mechanical Specifications Number of Element 9 Element Length 908mm Weight 647g Rated Wind Velocity 210km h Diameter of Installation Pole φ45 φ50 mm 19 ...

Page 27: ...pedance Ω 50 Gain dBi 17 Polarization Vertical or Horizontal Half Power Horizontal Beamwidth 25 Vertical Horizontal Beamwidth 3dB 17 17 First Upper Side Lobe Suppression dB Front to Back Ratio dB 30 Max power W 200 Lightning Protection DC Earthing Connector N type Female Mechanical Specifications Diameter m 0 9 Weight kg 10 Rated Wind Velocity km h 126 Reflector Material Aluminum Alloy Pipe Radiat...

Page 28: ...the equipment against lightening surge electricity Parameters SL 35R SL 35P SL 23R SL 23P Frequency Range DC 2500MHz DC 1500MHz Impedance 50Ω Insertion Loss 0 2dB VSWR 1 2 Power Capacity 200W Discharge Voltage DC230V 15 Insulated Resistance 10000MΩ DC100V Connector Type N J N K N K N K N J N K N K N K Dimension 58 25 35mm 75 20 45mm Weight 140g 110g 21 ...

Page 29: ...nd antenna Mechanical Specifications 40 70 Run Temperature Range Min Setting Temperature 20 Max Pull N 500 Weight kg km 190 Single Flection 15 22 Electrical Specifications Impedance Ω 50 1 Attenuation dB m 10 9 100 950M Transmit Speed Coefficient 0 82 Max Rating Power kW 0 34 950MHz Echo Ullage customized Capacitance pF m 82 Min Incurvated Semidiameter Many Flection 30 ...

Page 30: ...tor one set 2 Spectrum analyzer one set 3 Vector network analyzer one set 4 Noise Figure analyzer one set 5 30dB electric attenuator and 50Ω standard load both of 50W one set respectively 6 Some coaxial cables 4 2 Testing Frequency Band To be customized Downlink 935 960MHz Uplink 890 915MHz 4 3 Testing Method Procedure 4 3 1 Maximum Output Power 1 Connect testing system according to figure 4 3 1 m...

Page 31: ...rding to the real line in figure 4 3 1 2 Shut down reverse link while measuring forward link and shut down forward link while measuring reverse link 3 Set the output frequency of signal generator as the central working frequency of repeater 4 Set repeater gain to its maximum 5 Adjust the output level of signal generator until the output of repeater reaches its maximum The maximum gain of repeater ...

Page 32: ...ile measuring forward link and shut down forward link while measuring reverse link 3 Set repeater gain to its minimum 4 Adjust the output of signal generator until the output of repeater reaches its maximum 5 Measure the output level of repeater with spectrum analyzer Minimum gain is the difference between this value and the output of signal generator The difference between maximum gain and minimu...

Page 33: ...ng reverse link 3 Set the output frequency of signal generator as the central working frequency of repeater 4 Set repeater gain to its maximum 5 Adjust the output level of signal generator until the output of repeater reaches its maximum i e the output of signal generator is Lin max 6 Connect testing system according to the real line in figure 4 3 1 the dotted line is a figure showing the connecti...

Page 34: ...same method Vector network analyzer Repeater Attenuator figure 4 3 2 4 3 8 Spurious Emission 1 Connect the testing system according to the figure 4 3 1 2 Shut down reverse link while measuring forward link and shut down forward link while measuring reverse link 3 Set repeater gain to its maximum 4 Set the start frequency stop frequency and corresponding RBW value as required in the test 5 Measure ...

Page 35: ...equency is f1 band width 200kHz RBW automatic Referenced level proper average value chosen 4 3 10 Group Time Delay 1 Connect the testing system according to the real line in figure 4 3 2 2 Set the central frequency of network analyzer as the central frequency of repeater frequency span as the operating band width of repeater and the output level as the maximum input level of repeater Calibrate del...

Page 36: ... generator figure 4 3 3 1 Connect testing system according to figure 4 3 3 make the calibration according to the dotted line before test 2 Shut down reverse link while measuring forward link and shut down forward link while measuring reverse link 3 Set repeater gain to its maximum Measure NF with noise figure analyzer 29 ...

Page 37: ...e organization and execution of the project construction are formulated to ensure the quality of the construction and to establish a reputable image of WRI Hongxin Corp all over the country while all the standards set by the operators are under simultaneous execution The following organization flow must be observed for the execution of a single respective construction works The general working flo...

Page 38: ...verage area such as height of buildings geographic location flow of people good for analyzing call numbers inside the buildings structure of the buildings and other information Local environment service area of each building length and width layout of each floor local characteristics positions of passages and so on 1 2 Environment for wireless signal The detailed data collection on the wireless en...

Page 39: ...rotection as well as the sizes Determine if there are any special requirements for the main equipment or feed line of antenna such as the area with frequent lightening based on the local climate 5 Re arrangement of data Standardized reconnaissance data shall be good for formulating design plan and good for filing and checking of the files of works Therefore all the testing data must be filed after...

Page 40: ...ing to the market requirements after repeated examination of the feasibility of technical plan and verify the pricing of the plan after comparison Key requirements for design 1 Reinforce the analysis on the rationality of the plan 2 Decide reasonable editing format and corresponding fonts according to the template of the design 3 Reinforce the analysis on pilot panorama testing 4 Use special drawi...

Page 41: ... check daily progress Engineering supervisor is responsible for chief engineer He must report construction schedule to chief engineer and is not allowed to execute the schedule until it is approved Engineering supervisor must report progress of the construction to chief engineer every day Security Inspector responsible for the security of the constructions including checking of the certificate for...

Page 42: ...ifficult issues in various phases of construction before start of construction and provide solutions In case of any alterations in the construction they must be analyzed for feasibility under the supervision of engineering supervisor based on the Sheet for Alteration of Engineering Design formulated by the company Then fill in Sheet for Alteration of Engineering Design after confirmation that the ...

Page 43: ...aces of the country based on the construction at the early phase so as to eliminate the following Construct without familiarization of the drawings or the construct while drawings have not been check jointly alter design without the approval of the design department Fail to construct according to drawings Fail to construct according to the standard for inspection and acceptance of the construction...

Page 44: ... completion final account of completion construction summary and other necessary documents it will be proper to submit application for inspection and acceptance to the construction unit to perform inspection and acceptance according to process The process is Re arrange various reports and files Organize inspection and acceptance authorities organize inspection and acceptance committee or team in a...

Page 45: ...a period of time depending on actual situation in various places Preparations for data of construction completion The data and documents for construction completion are the major files that display the overall information on the construction and will be helpful for the future maintenance and repair The data and documents for construction completion include the following Reconnaissance report desig...

Page 46: ...GZF9003 V Wireless Repeater User s Manual 5 2 System Installation Work flow of outdoor construction shown as the figure 5 2 figure 5 2 39 ...

Page 47: ...ter To ensure safety during the installation make sure to wear safety belt for overhead operations and wear safety hats for on the ground operations and take care never working in rainstorms 5 2 2 User s Cooperation WRI Hongxin s technicians will take charge of the equipment installation and the user s technicians should provide help if necessary To ensure the normal running and maintenance of the...

Page 48: ...nclude electric percussion drill iron hammer pulley rope safety belt safety hat ladder screwdriver hacksaw knife pliers spanner compass tape tweezers electric iron etc 5 2 5 Technical Documentation The installation technicians should keep on hand and read in advance such documents as Project Design Document Equipment Installation Specifications and User s Manual for the GZF9183 V Frequency Shiftin...

Page 49: ...ependent and stable 150VAC 260V AC nominal 220V 50Hz or 44VDC 54VDC power should be provided based on different need the value of AC power is to be customized for example 110V 60Hz AC power will be provided in some country which mustn t be shared with other large power communication equipment and electric appliances 6 The installation building iron tower or high pole should be provided with lightn...

Page 50: ...unpacking inspection fill out the Unpacking Inspection Report Both parties shall sign the Report and then the goods shall be handed over to the user Each party shall hold one copy of the Unpacking Inspection Report and the project supervisor should feed back the Inspection Conclusion within seven days to the vendor for documentation 5 5 Installation of the Main Chassis of the GZF9183 V Repeater Mo...

Page 51: ...GZF9003 V Wireless Repeater User s Manual figure 5 5 1 Scheme of installation 44 ...

Page 52: ...Installation Instruction Step 1 As shown in figure 5 5 1 fasten the bracket and staple bolt on embracing pole with M12 lengthened bolt flat washer 8 GB97 1 85 and spring washer 8 GB93 87 Step 2 As shown in figure 5 5 1 remove down panel of main casing for Repeater fit four M8X25 bolts GB5870 86 over the installation hole of equipment the installation hole of frame flat washer 8 GB97 1 85 and sprin...

Page 53: ...GZF9003 V Wireless Repeater User s Manual II Repeater Installation Mode of Bracket on Wall figure 5 5 2 Scheme of installation 46 ...

Page 54: ...with Churn Drill hammer the size of which is the same as that of installation hole for bracket Step 2 As shown in figure 5 5 2 put six steel expansion bolts and expanding pipes into bored holes then fit bolts over the installation hole on bracket as well as flat washer and spring washer at last put nuts onto bolts and screw them down tightly Step 3 As shown in figure 5 5 2 remove down panel of equ...

Page 55: ... Screw bolt M12 X 60 2 4 GB97 1 85 Flat washer 12 2 5 GB93 87 Spring washer 12 2 table 5 5 3 Details for installation scheme Installation Instruction Step 1 As shown in figure 5 5 3 fasten canopy and attached staple bolt on embracing pole with bolt M12X60 GB5870 86 flat washer 12 GB97 1 85 and spring washer12 GB93 87 Step 2 As shown in figure 5 5 3 fasten bracket A and B of canopy on installation ...

Page 56: ...GZF9003 V Wireless Repeater User s Manual IV Installation Mode for Canopy on Wall figure 5 5 4 Scheme of installation 49 ...

Page 57: ...nto steel expansion bolts and screw them down tightly 5 6 Antenna Feeder Installation The GZF9183 V Repeater should be connected to the set of antenna feeder system it is the service antenna connected to the service interface The requirements for the installation of the antenna feeder system of the GZF9183 V Repeater are the similar to those for the BTS with the differences described below For mor...

Page 58: ... radius First time bending radius 10DFB 150mm 60mm 1 2 common 210mm 70mm 1 2 super soft 120mm 40mm 7 8 360mm 120mm z Feed line must fix with laces L type base of feed line and wave guide card with single double hole partition code and PVC tube The table for the fixed distance is as follows 1 2 feed line 1 2 feed line When placed horizontally 1 0m 1 5m When placed vertically 0 8m 1 0m z In the area...

Page 59: ...they have to be placed together z It is prohibited to enlace the cables along with the lightning cables z When the cable is laid in frames or casing the laying must be flat and even Feed line must be enlaced evenly along the frame See 2 3 1 4 for fixed distances for feed lines Cables must be lined closely in order after being enlaced Extra part of laces must be cut off z When cables are laid in su...

Page 60: ...cable installation 5 6 2 Installation of the Service Antenna Feeder The installation of the service antenna and the connected feeder is shown in figure 5 6 2 B C E D A1 WRI A2 B C A1 Donor antenna Link antenna A2 Link antenna Service antenna B Antenna connector C Antenna feeder D E RF lightning arrestor connectors figure 5 6 2 Connection of the service antenna and feeder The service antenna of the...

Page 61: ...ete fittings and assembly position must be correct z If at the cutting point a pyrocondensation sleeve is required the pyrocondensation sleeve shall have identical and proper length providing even pyrocondensation z For construction of cable protect terminals from water and humidity A terminal exposed outdoors must be made waterproof handling with waterproof adhesive tape Terminals must be sawn of...

Page 62: ...ion 2 For installation on the wall the grounding cable of the equipment is connected to the integrated grounding bar The grounding resistance R of the grounding bar should be less than 5 Ω and the grounding junction pieces should be protected from corrosion 5 7 1 1 Cable Laying of Ground Wires z Bus ground wires should be of 35mm2 guide line and sub ground wire of 16mm2 guide line z Ground wires m...

Page 63: ...laced in wire casing the fastening interval for wire casing is 0 3M 5 7 1 2 Connection of Ground Wires z Ground wires between equipment and users feeder lines user antenna brackets and grounding row are sub ground wire connected with 16mm2 copper cored rubber cable z Ground wires between grounding row and ground net or outdoor antenna bracket and ground net are bus ground wires connected with 35mm...

Page 64: ...s the curving angle of ground wires should be above 90o and the curvature radius above 130mm z The grounding points of equipment protection zone feeder lines outdoor antenna backstop should be apart from each other Every grounding points require to have a fine connection without any loose and be made anti oxidation handling to be covered with rust resisting lacquer or silver powder and waterproof ...

Page 65: ... line and ground wire must be correspondingly connected Dielectric resistance between cable cores and between cable cores and ground should not be less than 1M Ohm z Alternating current 220V power supply wires adopt 2 5mm2 3 rubber kicking z Power supply wire should not be tied together with other cables z Cable laying of Power supply should be put in PVC pipe straight and vertical z If power supp...

Page 66: ...troller with circuit of accumulator then connect solar plate with the circuit of the charging controller z Power supply in solar repeater requires to be installed in places with long time and sufficient sunlight z Whether power supply in solar repeater should be installed in the south facing the north or in the north facing the south depends on local conditions 5 8 Installation of Embracing Pole A...

Page 67: ...depth of stay wire should accord with requirement and the deviation should not exceed 5cm The deviation of pull distance should not exceed 10cm z Antenna bracket for tower must be of certain strength and stableness and satisfy the wind resistance requirement after installation of equipment and safety requirement of operation on the tower z Basic abutment plate should be installed according to desi...

Page 68: ...er s Manual design z Pilot assembly must be made before the installation of tower combined in separate parts The deviation of screw aperture position must be less than 2mm z Effective lightning conductor must be installed in iron tower ...

Page 69: ...eptance 2 Form of process check and acceptance 1 VSWR test 2 Waterproof check 3 Grounding and lightening arrest check 1 Job guidance for equipment test 2 Project of equipment test 3 Report of equipment test 1 Project of system test 2 Report of system test 1 Control of antenna power 2 Route test 3 Data statistics of machine room of base station 1 Sorting of test data 2 Opening report 3 Sorting of f...

Page 70: ...tion shall be implemented correctly and securely and ensure the position and direction for installation are correct and azimuth angle of antenna shall be recorded azimuth with true north as 0o z Process of equipment installation ensure the equipment is installed securely height and location of installation are exact without causing damage to cabinet appearance equipment be installed within cabinet...

Page 71: ... not satisfied till improvements conform to construction specifications and requirements presented by the owner 6 2 2 Implementation of Equipment Test Efforts shall be made to ensure whether performance index of equipment is affected or not in process of transportation and installation and signal source is checked Check shall be conducted on signal source donor antenna or wired coupling to see whe...

Page 72: ...anual a Input power of local equipment Receiving power from BTS Index receiving power of donor antenna shall be higher than 75dBm b Diagram of output power test of local equipment downlink c Input power of remote equipment 65 Link Antenna ...

Page 73: ...GSM z Signals received within outdoor coverage system by donor antenna shall be tested with spectrometer to ensure quality of signals received and that strength of signals meets requirements of index reaching 85 55dBm z Downlink Signal which is amplified in the repeater should be measured at the antenna port which is connected with service antenna the signal power shall be 33 45dBm based on the ty...

Page 74: ...ain shall be adjusted to ensure strength of output signals reaches 43dBm the nominal value of the equipment z The isolation between uplink and downlink shall be measured the value shall be at lest 120dB z VSWR of antenna feeder system within working frequency shall be measured by means of length measuring methods with VSWR tester typically 1 4 to ensure the antenna feeder system works normally z I...

Page 75: ...th those prior to coverage results of which shall be adopted as evaluation basis for check and acceptance to be conducted by the owner z Test instrument spectrometer Pilot premier test software Notepad Mobile phone to be tested GPS and digital camera c Content for test Location and panorama of project Data shall be collected by means of GPS and digital camera Test of coverage quality within covera...

Page 76: ... from data shall be observed Parameters shall be readjusted timely when abnormal circumstance occurs 6 2 5 Collection of Opening Data a Sorting of test data Data to be cleared up include at least the following Data for equipment test Data for system test Data for route test Statistics data for equipment room Data above shall be submitted to the Owner as evaluation basis b Opening report All docume...

Page 77: ...pening specifications Test data includes VSWR test data output power of equipment input power of donor antenna and test data for uplink noise floor of equipment Premier test software is recommended for DT dialling test which includes RxLevsub of coverage area and route map and statistic report list of such data as RxQualSub Handover and Cell Reselect data Issues in suspension in project it is requ...

Page 78: ...eck if the antenna fails to receive signal due to the change of angle when the signals can no be received or received poorly while the equipment is found to work with normality Adjust antenna and re fix it when it is found with changed angle When the equipment is working normally do not touch the joints between equipment if not necessary so as to prevent joints from getting loosened and improperly...

Page 79: ... be liable for any consequences caused due to the unauthorized start of the product Check all the attached accessories by packing list upon reception of the equipment of our company Contact the supplier in time for any shortage Our company owns the property right of our products which is protected by State law No units or individuals are allowed to copy them Our company shall investigate any of th...

Page 80: ... rough loading unloading case upside down severe squeezing direct exposure to the rain or snow and mechanical damage 9 2 Storage The GZF9183 V Repeater should be placed in the original packing box before it is used The storage environment requires that the temperature should be 25 C 65 C and the relative humidity should not be greater than 95 There should be free of harmful gas or combustible expl...

Page 81: ... Base Transceiver Station COVERAGE ANT Coverage Antenna or Service Antenna DONOR ANT Donor Antenna DLX Duplexer FLT Filter GSM Global System for Mobile HPA High Power Amplifier IMD3 3 rd order Intermodulation Distortion LNA Low Noise Amplifier MSC Mobile Switching Center Min Rx Lev Minimum Receive Level HPA High Power Amplifier REPEATER Repeater SNR Signal Noise Ratio VSWR Voltage Standing Wave Ra...

Reviews: