34
GZF9003-V
Wireless Repeater
User’s Manual
orderly operation and to eliminate troubles.
Chief Engineer:
formulate and arrange the feasibility plan
according to the Rules of Management for Engineering Start,
Specifications for Construction and Service Specifications for the
Construction of the company, regularly or irregularly check the
construction and is responsible for the quality of the engineering,
progress, cost control, security and all affairs of the construction
and shall order the construction team to re-manage when he finds
disqualification during the construction of the works.
Engineering Supervisor:
responsible for the progress and
technique of the construction. Organize and arrange the
construction by all units according to the Engineering Design,
Specifications for Construction and Service Specifications for
Construction. Formulate the schedules for construction, guide
and standardize the execution of the engineering by the
construction units, solve problOMC at the site, ask construction
units to assist quality control engineers and debugging engineers
to conduct quality control and debugging, control and check daily
progress. Engineering supervisor is responsible for chief engineer.
He must report construction schedule to chief engineer and is not
allowed to execute the schedule until it is approved. Engineering
supervisor must report progress of the construction to chief
engineer every day.
Security Inspector:
responsible for the security of the
constructions, including checking of the certificate for operation at
high places and electrician’s certificate, all problOMC in operation
at high places, construction of the works with potential danger and
safe lighting.
QC:
responsible for quality control of the construction. Inform
Party A and the owners of the requirements for system inspection
and acceptance, control the process for the whole construction,
strictly check the operation and construction of the works
according to the cable laying standard and construction
specifications of Party A or Supervisor. Inform Engineering
Supervisor in written forms of the disqualification in the
engineering or potential trouble and ask him to revise. All the
written notice for modification must be handed in to chief engineer
after the construction is finished as a basis for evaluation of the
construction units.
Project Coordinator:
responsible for the coordination of
everything at the construction site, such as taking the equipment