SPYDER MODEL 5 ENGINEERING TOOL
–
USER GUIDE
31-00282ES-01
92
3.
To swap-in the device, right-click on the IRM Program
folder
in the tree, then click
Actions
, and then click
Swap
in the
context menu.
RESULT: The device is swapped in. In the tree, the IRM program is restored showing all subfolders. The successful
swap-in is displayed in
Irm
Operations Monitor
.
Procedure (Multiple Devices)
1.
To swap-out the devices, expand the BACnet network.
2.
Right-click on the IRM
Config
folder in the tree, then click
Actions
, and then click
Swap Out
in the context menu.
RESULT: The devices are swapped out.
The successful swap-out is displayed in the
Irm Operations Monitor
.