![Honeywell MZ-PCSV74 Planning, Installation And Service Manual Download Page 35](http://html.mh-extra.com/html/honeywell/mz-pcsv74/mz-pcsv74_planning-installation-and-service-manual_153433035.webp)
Chapter 5 - Servicing
Publication
Contains information about…
Troubleshooting Your System
Installing System Options
Installing Drives
Getting Help
Jumpers, Switches, and Connectors
I/OPorts and Connectors
Abbreviations and Acronyms
5.3
Servicing Honeywell options
CAUTION
Do not damage the EMI gasket fingers when removing/installing boards.
WARNING
Use a grounding strap and grounded work surfaces and equipment when handling any electro
statically sensitive components such as the video cards, NIC adapter cards, and SCSI controller
cards. Store and transport parts only in electro statically safe containers.
l
Slot requirements for General Ethernet and FTE node setup
5.3.1
Slot requirements for General Ethernet and FTE node setup
The following table identifies the specific slots for each of the Honeywell options for general Ethernet
and FTE node configurations.
Configuration
PCIe x 8
CPU
PCIe_G3 x
16 CPU
PCIe_G3 x
1 PCH
PCIe_G3 x
8 PCH
FTE Supervisory (Default)
Free
Slot
Free Slot
Free Slot
Free Slot
1 NIC, Standard Ethernet through
one on-board NIC
Free
Slot
Free Slot
Free Slot
Free Slot
2 NICs, Standard Ethernet
through two on-board NICs
Free
Slot
Free Slot
Free Slot
Free Slot
- 35 -