
DK
S
N
P
GR
➔
www.docuthek.com
D
GB
F
NL
I
E
TR
CZ
PL
RUS
H
Safety
Please read and keep in a safe place
Please read through these instructions
carefully before installing or operating. Following the
installation, pass the instructions on to the opera-
tor. This unit must be installed and commissioned
in accordance with the regulations and standards
in force. These instructions can also be found at
www.docuthek.com.
Explanation of symbols
• , , ,
... = Action
▷
= Instruction
Liability
We will not be held liable for damage resulting from
non-observance of the instructions and non-com-
pliant use.
Safety instructions
Information that is relevant for safety is indicated in
the instructions as follows:
DANGER
Indicates potentially fatal situations.
WARNING
Indicates possible danger to life and limb.
CAUTION
Indicates possible material damage.
All interventions may only be carried out by qualified
gas technicians. Electrical interventions may only be
carried out by qualified electricians.
Conversion, spare parts
All technical changes are prohibited. Only use OEM
spare parts.
Changes to edition 08.7
The following chapters have been changed:
– Installation
– Wiring
– Certification
Contents
Operating instructions
D
GB
F
NL
I
E
GB-1
05469
Translation from the German
© 2018 Elster GmbH · Edition 04.18
Tightness control TC , TC , TC
Tightness control TC , TC , TC . . . . . . . . .
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Checking the usage . . . . . . . . . . . . . . . . . . . . .
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mounting TC 1V to valVario controls . . . . . . . . . 3
VAS 6 – 9, VCS 6 – 9 . . . . . . . . . . . . . . . . . . . . . . 3
Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Preparing the wiring . . . . . . . . . . . . . . . . . . . . . . 5
Connection diagram for TC 1, TC 2 . . . . . . . . . . 5
Connection diagram for TC 3. . . . . . . . . . . . . . . 6
Finishing the wiring. . . . . . . . . . . . . . . . . . . . . . . 6
Tightness test . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Setting the test instant . . . . . . . . . . . . . . . . . . 6
Setting measurement time t
M . . . . . . . . . . . . . . . . . 7
Commissioning. . . . . . . . . . . . . . . . . . . . . . . . . 8
Assistance in the event of malfunction . . . . . 8
Replacing the fuse . . . . . . . . . . . . . . . . . . . . . . . 9
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Technical data . . . . . . . . . . . . . . . . . . . . . . . . 0
Safety information in accordance with
EN 6508- . . . . . . . . . . . . . . . . . . . . . . . . . . . 0
Logistics . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Certification . . . . . . . . . . . . . . . . . . . . . . . . . .
Contact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety
Contents