![Honeywell HERMetic UTImeter Gtex Chem Operation And Service Manual Download Page 37](http://html.mh-extra.com/html/honeywell/hermetic-utimeter-gtex-chem/hermetic-utimeter-gtex-chem_operation-and-service-manual_151848037.webp)
37
10.2 Checking the battery
Please note that in case you have to change the
battery, it must be done only in a safe area. Refer to
section 10.3 “Battery replacement”.
10.2.1 Before starting gauging
Switch on the unit. The buzzer tones every 2 seconds if the
battery is not too low.
The following sequences are displayed as per Figure 10-1,
the 4
th
sequence shows the remaining power of the battery
in percentage and as a bar-graph.
If the power left is less than 50% we recommend to have
a spare battery ready for exchange. See also 10.3 “Battery
replacement”.
If the power left is less than 20% the message is blinking to
advise that the power may not be enough to carry out all the
work.
If the battery is too low, the unit will stop on the message
“battery” as shown on Figure 10-2 and the buzzer tones
continuously. Change the battery as per 10.3 “Battery
replacement”.
If it is not possible to switch on the unit, the battery is out
or work. Change the battery first, as per
10.3
“Battery
replacement”.
ON
UTImeter
Battery
Init.
*********
25.94°C
Ver x.xx
97%
░ ░ ░ ░ ░
Figure 10-1
░
ON
UTImeter
Battery
Init.
*********
Battery
Ver x.xx
0%
Figure 10-2
Summary of Contents for HERMetic UTImeter Gtex Chem
Page 63: ... 63 ...
Page 64: ...64 www tanksystem com ...
Page 65: ... 65 ...
Page 66: ...66 www tanksystem com ...
Page 67: ... 67 ...
Page 68: ...68 www tanksystem com ...
Page 69: ... 69 ...
Page 70: ...70 www tanksystem com ...
Page 71: ... 71 ...
Page 72: ...72 www tanksystem com ...
Page 73: ... 73 ...
Page 74: ...74 www tanksystem com ...