EP03-300-200
December,
2003
Release 200
Version 1.0
Experion PKS CEE-based Controller Specifications and Models
16
Compliance to European Union Directives.
This product has the CE mark and is approved for
installation within the European Union and EEA regions. It has been designed and tested to meet the
following directives:
•
EMC Directive.
This apparatus is tested to meet Council Directive 89/ 336/ EEC Electromagnetic
Compatibility (EMC) using a technical construction file and the following standards, in whole or in
part:
•
EN 50081- 2 EMC – Generic Emission Standard, Part 2 – Industrial Environment
•
EN 50082- 2 EMC – Generic Immunity Standard, Part 2 – Industrial Environment
The product described in this document is intended for use in an industrial environment.
•
Low Voltage Directive
. This product is also designed to meet Council Directive 73/ 23/ EEC Low
Voltage, by applying the safety requirements of EN 61131– 2 Programmable Controllers, Part 2 –
Equipment Requirements and Tests.
Table 2. Agency Standards Compliance
Agency
Standard
Description
CE Mark
Standard Compliance Electrical Emissions and Susceptibility
CSA
C22.2 No. 142-M1983
Process Control Equipment
C22.2 No. 0-M1982
General Requirements Canadian Electrical Code, Part II
C22.2 No. 4-M1982
Bonding and Grounding of Electrical Equipment
FM
ISA S12.12
Non-incendive Electrical Equipment for Use in Class I & II, Div.
2 and Class III, Div 1 & 2 Hazardous (Classified) Locations
UL
508
Industrial Control Equipment
C-Tick
Australian
Radiocommunications
Act of 1992
Electromagnetic Compatibility
Control Processor Module Hardware Specifications
The Experion PKS C200 Control processor module meets the following specifications:
Table 3. TC-PRS021, TK-PRS021 Specifications
Parameter
Operative and Storage Limits
Transportation Band
Module Power Requirements
+5 VDC +/- 5% @ 1.5 A
+3.3 VDC +/- 5% @ 1.0 A
Module Battery Backup Time
1
Lithium Battery (standard, built in)
Battery Extension Module (BEM)
144 hours (non-rechargeable,
replaceable) - 6 days
120 hours (rechargeable) - 5 days
Lithium battery is
disconnected during
shipment.
2
1
CPM backup is provided via the Lithium Battery or the Battery Extension Module (BEM), but not by both. The Lithium
battery must be removed from the Control Processor if a BEM is used in the rack. A label inside the CP front door
provides that warning.
2
The 1/2AA Lithium Battery has a non-restricted classification due to its size. It can be shipped without any special
documentation or note on the shipping list. The battery is specified for operation from -55
°
C to +85
°
C.
See Table 1 (previous page) for all general environmental specifications and agency certifications.