94
SERVICE WORK ON THE CHASSIS
12
Nut, steering head
M20×1.5 10Nm
Guideline
Main work
– Loosen screws
.
– Loosen and retighten nut .
2
1
– Using a plastic hammer, tap lightly on the
upper triple clamp to avoid stresses.
– Tighten screws .
Guideline
Screw, upper triple clamp
M8
20Nm
Finishing work
–
Check the steering head bearing play. (p.91)
–
Remove the motorcycle from the lift stand.
(p.82)
1
(14.8Ibf.ft)
(7.4Ibf.ft)