2
CONTENTS
...................................................................
1. SAFETY INSTRUCTIONS
. 3
.............................................................
2. SAFETY LABEL LOCATIONS
. 9
............................................................................
CE mark location
. 10
.....................................................
3. COMPONENT IDENTIFICATION
. 11
................................................................
4. PRE-OPERATION CHECK
. 13
.......................................................................................
Engine oil
. 13
............................................................................
Transmission oil
. 14
......................................................................................
Air cleaner
. 14
.................................................................................................
Fuel
. 15
.........................................................
Gasoline containing alcohol
. 16
..................................................................................
Tire pressure
. 17
............................................
Checking the Wheel Installation Pin
. 17
.................................................................
Tools and Attachments
. 17
........................................
Tightening the Rotary Installation Part
. 18
.................................................................
5. STARTING THE ENGINE
. 19
.........................................................................
6. TILLER OPERATION
. 24
......................................................
Handlebar height adjustment
. 24
...............................................................
Tilling depth adjustment
. 25
................................................................................
Gear selection
. 26
...................................................................
Main clutch operation
. 27
................................................................
Normal operating angle
. 28
............................................................
Differential lock operation
. 29
....................................................................................
Tilling work
. 30
.................................................................
7. STOPPING THE ENGINE
. 31
................................................................................
8. MAINTENANCE
. 33
..................................................................
Maintenance schedule
. 33
..........................................................................
Engine oil change
. 34
.........................................................................
Air cleaner service
. 35
............................................................
Fuel strainer cup cleaning
. 36
.........................................................................
Spark plug service
. 37
.............................................................
Throttle cable adjustment
. 38
......................................................
Main clutch cable adjustment
. 38
...............................................
Differential lock cable adjustment
. 39
............................................
Checking and replacing rotary tines
. 40
...........................................................
9. TRANSPORTING/STORAGE
. 44
......................................................................
10. TROUBLESHOOTING
. 45
.............................................................................
11. SPECIFICATIONS
. 46
...............
MAJOR Honda DISTRIBUTOR ADDRESSES
. Inside back cover
.......
‘‘
’’ CONTENT OUTLINE
. Inside back cover
EC Declaration of Conformity
Summary of Contents for FR750
Page 15: ...12 SPARK PLUG ENGINE UPPER COVER DRAG BAR MUD GUARD ROTARY TINES V BELT COVER MUFFLER...
Page 51: ...48 MEMO...
Page 52: ...49 MEMO...
Page 53: ...50 MEMO...
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ...36777620 00X36 777 6200 K1 oHonda Motor Co Ltd 2009 efgsY1200 2009 09 Printed in Japan KS...