- 5 -
5.
Refer to the drawing for step 5. Assembly of the nozzle shut off valve (42). In this assembly
process, you’ll select one of the four nozzles (37/38). This is not a permanent selection, as you may
change nozzles according to the job being done. Screw the adapter (49) into the nozzle shut off valve
(42). Screw the last nipple connector (16) into the other side of the valve. Screw the gasket (36) into
the nipple connector
then add a nozzle
(37/38) and nozzle
cap-nut (39).
6.
Refer to the
drawing for step 6,
for connecting the
sand metering valve
assembly (Step 4)
and the nozzle shut
off assembly (step 5).
Slide the two
hose clamps (23)
over each end of the
media hose (24). Press one end of the hose over the nipple on the media outlet pipe (22) and the
other end over the adapter (49). Both hose ends should be firmly seated on the nipples. Slide the
hose clamps along the hose to each nipple and tighten the clamps very firmly. They have to resist the
force of 65 to 125 psi.
7.
Fasten the two handlebars (06) to the tank using four pan screws (08) and four washers (50) and
four hex nuts (09). Note:
keep the handle curve
ends upward.
8.
Locate the axle (05) and
slide it through the holes in
the sides of the handlebars
(06). Place one wheel (02)
at each end of the axle and
fasten them into place with
cotter pins (03) and washer
(51).
9.
Insert the fixed foot (04)
onto the fitting on the bottom
of the tank near the edge.
Use your cotter pin (03) to
hold the foot to the tank.
10.
Before beginning opera-
tions, go back over each
connection; double checking
to ensure that all are tight
and properly sealed.
STEP 5
STEP 6
STEP 7
Summary of Contents for RD00913191
Page 2: ...2...