OPERATION
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
19
ESZ 250D / ESZ 500D / ESZ 1000D
14.2
Operation
x
Check, whether the emergency switch (11) is pressed. For unlocking, turn the emergency
switch (1) clockwise.
x
For lifting the load, press the up-down-switch
▲
(10).
x
For lowering the load, press the up-down-switch
▼
(10).
x
The machine is provided with up limit switch and down limit switch, which prevent that the
steel rope is completely or wrongly unwound and/or the load is lifted up too high.
Never totally unwind the rope. At least 2 windings of the rope must remain on the drum!
x
In the emergency case press the emergency switch (11) immediately. The machine stops.
14.2.1
Use with deflection pulley
x
The machine is provided with a deflection pulley and hook. When they are used correctly the
machine can lift double payload.
x
Mount the deflection pulley as shown on the below picture.
x
When using the deflection pulley, hang the lifting hook into the hook holder of the carrier
housing. With help of 2 steel ropes to lift the load the machine is now capable to lift the double
load.