OPERATION
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
Seite 25
BBS 350
16
OPERATION
16.1
Hand bandsaw set-up procedure
W A R N I N G
Machine must be voltage-free and separated from the main.
1.
Check the belt tension:
The belt tension is controlled by hand and if it
is possible to push it more than 10cm, the belt
should be tightened.
2.
Check blade tracking
3.
Check blade guide adjustment
C A U T I O N
Slide the blade guide over the blade
so that only the required cut distance
remains free.
4.
Check saw blade tension:
Proper blade tension is achieved if the blade
defects no more than 3-6 cm when it is firmly
moved by hand at the center location of the
blade.
5.
Check level of lubrication tank and refill if
necessary.
N O T I C E
Use only water with a light detergent
(soapy liquor; Washing up) as a coolant.
Summary of Contents for BBS 350
Page 33: ...ERSATZTEILE SPARE PARTS HOLZMANN MASCHINEN GmbH www holzmann maschinen at Seite 33 BBS 350 ...
Page 34: ...ERSATZTEILE SPARE PARTS HOLZMANN MASCHINEN GmbH www holzmann maschinen at Seite 34 BBS 350 ...
Page 35: ...ERSATZTEILE SPARE PARTS HOLZMANN MASCHINEN GmbH www holzmann maschinen at Seite 35 BBS 350 ...
Page 36: ...ERSATZTEILE SPARE PARTS HOLZMANN MASCHINEN GmbH www holzmann maschinen at Seite 36 BBS 350 ...
Page 41: ......