Hologic AW-17237 Manual Download Page 3

 

Selenia Dimensions and 3Dimensions Systems 

 

Addendum, Radiation Shield Installation 

 

MAN-05397 Revision 002, October, 2017 

Hologic, Inc. 

Page 1 of 4 

 

36 Apple Ridge Road, Danbury, CT 06810 (800) 447-1856 

 

© 2017 Hologic, Inc. The information contained in this document is proprietary. Unauthorized distribution is prohibited.

 

 

  

This addendum modifies your Selenia

®

 Dimensions

®

 and 3Dimensions

 Service Manuals 

installation procedure for the longer radiation shield on the Universal Acquisition 
Workstation (UAWS). 
Place this addendum with your Service Manual for future reference. 

1.1 

Installation of Radiation Shield 

 
 

 

 

Warning: 
Use gloves and eye protection when handling the X-ray Shield. 

 

   

 

 

Warning: 

Do not handle or position the Radiation Shield alone. Two people are 

required to handle and position the tempered glass shield to minimize stress 
to the shield. 

 

   

 

 

Caution: 
The X-Ray Shield is made of tempered glass and is fragile. Use extreme care when 
handling and installing the shield. When installing, the shield must be precisely 
positioned and must not be flexed in any direction. 

 

   

 

 

Caution: 
Inspect the X-ray Shield before and after installation. Small imperfections embedded 
in the glass are acceptable. Do not install the shield if cracks or chips are visible. 

 

   

 

 

Caution: 
Use care when cleaning the X-ray Shield to avoid excessive force and movement of 
the shield. 

 

   
 

Reviews: