background image

amount

pos.

designation

P4

door wing profile - right (95 mm)

P5

door wing profile - middle (95 mm)

P8

crossbar (57 mm)

P6

door wing profile - top/bottom (638 mm)

4

V37

corner angle 50/50/6

4

S46

countersunk screw 4,8 x 50

4

S50

countersunk screw 4, x 38

38

double revolving door (x)

step 7 

 

assemble of the double-wing revolving door - right -

countersunk screw 4, x 38

You will need following:

12

view from outside

corner angle

countersunk screw 4, x 38

countersunk screw 4,8 x 50

countersunk screw 4,8 x 50

countersunk screw 4,8 x 50

countersunk screw 4,8 x 50

countersunk screw 4, x 38

countersunk screw 4, x 38

13

Slide the corner angles into the door wing profile - right - and into the door

 

wing profile - middle.

Slide the door wing profile - top/bottom - on the corner angle, so that a

 

complete frame is formed.

Screw the frame in to the corner with the countersunk screws 4, x 38.

Insert the crossbar and tighten it to the frame with countersunk 

 

screws 4,8 x 50.

P4

P5

P8

P6

P6

corner angle

corner angle

corner angle

Summary of Contents for teahouse

Page 1: ... teahouse assembly instruction state 01 02 2013 ...

Page 2: ...nstruction carefully Model teahouse Description The teahouse blends with the timeless design especially in asian gardens but it also is an eye catcher for any other garden The pavillon is also equipped with a circumlating drain incl an aluminium downspout Standard features include two double swing doors with lockable latch key and two double swing windows with window opener In high winds a secure ...

Page 3: ...eview of the assembly process 22 23 door element step 1 24 25 door element step 2 26 27 window element step 3 28 29 window element step 4 30 31 window element step 5 32 33 side element step 6 34 35 carton 8 double revolving door 36 37 double revolving door step 7 38 39 double revolving door step 8 40 41 double revolving door step 9 42 43 double revolving door step 10 44 45 double revolving door st...

Page 4: ...76 77 roof element step 26a 78 glazing 79 glazing step 27 80 81 glazing step 28 82 83 glazing step 29 84 85 glazing step 30 86 87 double revolving door step 31 88 89 double window step 32 90 91 glazing step 33 92 93 glazing step 34 94 glazing step 35 95 glazing step 36 96 97 completion step 37 98 99 completion step 38 100 101 completion step 39 102 103 completion step 40 104 105 completion step 41...

Page 5: ...chine with drill Ø6 5 mm 1 drill Ø3 5 mm 1 drill Ø4 0 mm 1 open end wrench 10 mm 1 slot screw driver 1 waterlevel 1 file 1 to remove any burrs of the profiles rubber tipped hammer 1 scissors pincers 1 to devide glass blocks taoe measure 1 for the assembly you will need following tools ...

Page 6: ... equitable tools Pay attention the the ladder has a safe standing during the assembly accident risk Please store all cartons dry and protected from direct sunlight All photographs and sketches are only samples so they are not drawn to scale general information info Attention read the instructions attentively before assembling before assembling ...

Page 7: ...us to have a partly assembled house standing in the garden No open fireplaces in the teahouse Free the roof from snow loads more than 10 cm In stormy weather you have to shut door and windows The manufacturer is not responsible for any damages caused by wrong assembly or act of god during the assemble general ...

Page 8: ...ass block 3 mm 9999 0036 V45 40 glass block wood set of 9999 V103 2 silicon 10109413 overview pos no required quantity existing quantity designation purpose of use art no V107 4 drain blend angle inside 9999 V110 8 connector roof grill 9999 carton 1 connecting material und small parts please check that all items are included You can assign to content of each accessories bag based on the colour mar...

Page 9: ...M6 DIN 934 9999 00128 overview pos no required quantity existing quantity designation purpose of use art no V55 2 holder for downpipe 9999 0027 S5 2 hexagon head screw M6 x 16 DIN 933 9999 0183 S1 2 nut M6 DIN 934 9999 0128 S43 5 drill screw 3 5 x 16 DIN 7504 9999 0283 S27 2 fillisterhead 4 8 x 16 DIN 7981 9999 0 S32 2 shim A6 4 DIN 9021 9999 0173 ...

Page 10: ... roof grill 9999 S45 120 fillisterhead screw 4 2 x 16 DIN 7981 9999 0145 overview pos no required quantity existing quantity designation purpose of use art no S38 10 fillisterhead screw 4 8 x 60 DIN 7981 doorstop top 9999 0380 S23 14 countersunk screw 4 2 x 32 DIN 7982 grill below window 9999 0158 10 ...

Page 11: ...5 45 countersunk screw 4 8 x 19 DIN 7982 9999 0162 overview pos no required quantity existing quantity designation purpose of use art no S12 S1 115 115 hexagon head screw M6 x 12 nut M6 DIN 933 DIN 934 9999 0124 9999 0128 S37 115 hexagon protection cap M6 9999 0098 overview pos no required quantity existing quantity designation purpose of use art no S43 55 drill screw 3 5 x 16 DIN 7504 9999 0283 1...

Page 12: ...asket 4 6 mm dome 9999 0119 V114 110 lfdm construction gasket 1 mm KPT grills TR grills 9999 V98 100 lfdm grill gasket 2 mm KPT grill 9999 0376 V41 45 lfdm upper profile gasket 3 mm 9999 0190 V42 125 lfdm GHD gasket 1 edge grills TR grills 9999 0116 overview pos no required quantity existing quantity designation purpose of use art no V134 2 downpipe 9999 0 12 ...

Page 13: ...nnector 4082 mm P3 2 drain connector pre assembled in P2 4082 mm P4 4 edge grill 1971 mm P5 4 TR grill 1971 mm P6 1 2 TR grill with pipe 1278 mm P8 4 KPT grill 1971 mm P9 4 H6 rail 632 mm P10 4 H6 rail 637 mm P11 2 cover 1278 mm P12 4 covering profile 6 mm 1965 mm 13 carton 2 Please check the quantity of the supplied profiles door element 2x ...

Page 14: ...0 mm P2 2 drain 4082 mm P3 2 drain connector 4082 mm P5 4 TR grill 1971 mm P6 P6 1 2 2 TR grill with pipe 1278 mm P7 2 TR grill 734 mm P8 4 KPT grill 1971 mm P9 4 H6 rail 632 mm P10 4 H6 rail 637 mm P12 4 covering profile 6 mm 1965 mm 14 carton 3 Please check the quantity of the supplied profiles window element 2x ...

Page 15: ...1453 mm P15 8 KPT grill 739 mm P16 4 covering profilel 6 mm 1787 mm P17 8 covering profile 6 mm 1453 mm P18 8 covering profile 6 mm 739 mm P19 8 ail handling purlin 2415 mm P20 4 cover angle 2435 mm P21 16 u endings 6 mm 634 mm P22 8 u endings 6 mm 639 mm 15 Karton 4 Please check the quantity of the supplied profiles roof element 2x ...

Page 16: ...uantity designation purpose of use lenght in mm 1 lower pressure ring P 4 edge grill 400 mm P 4 KPT grill 400 mm 1 upper pressure ring 1 hood P 4 covering profile 6 mm 400 mm 16 carton 5 Please check the quantity of the supplied profiles dome 1x ...

Page 17: ...m 8 side edge area 2 724 x 631 mm 8 side edge area below 1 1212 x 627 mm 8 side 10 724 x 627 mm 8 side below 9 1093 x 564 mm 4 window 12 728 x 622 mm 4 window below 11 869 x 564 mm 8 revolving door 13 17 carton 6 und 7 Please check if all glass panes have been delivered correctly glass plan ...

Page 18: ...ting quantity purpose of use 1779 x 634 mm 4x lks 4x rts roof 3 6 1407 x 634 mm 4x lks 4x rts roof 4 7 689 x 625 mm 4x lks 4x rts roof 5 8 overview dimensions in mm required quantity existing quantity purpose of use 308 x 442 mm 8x dome 18 glass plan ...

Page 19: ...ack have to be assembled in the current step If the open end wrench is shown then the hexagon head screw can be screwed to the component please note Do not over tighten the screws just yet so that you can align the house again if necessary If the screw driver is shown then the countersunk or fillisterhead screw can be screwed to the component please note Do not over tighten the screws just yet so ...

Page 20: ...idual assembly steps Please note that some of the screws are needed at a subsequent date It is a very big complexity to insert the hexagon screws afterwards If this graphic is missing the fitting is at an subsequent date Please use a 10 mm open end wrench 20 What you should know before you start the assembling the use of hexagon head screws M6 x 12 ...

Page 21: ...n also use a cordless screwdriver with the corresponding bit Make sure you do not over tighten the screws If it should happen procedure the next larger screw All screws are stainless steel A2 21 to use of fillisterhead or countersunk screws What you should know before you start the assembling ...

Page 22: ...ments The assembly process can be found on page phase 4 assembly of the door and side elements Slide the elements together you can determine the arragements yourself For this see page 22 Performance of each assembly step The assembly instruction is a booklet with lots of detailed drawings and photos These are only samples so they are not drawn to scale So that you have loads of fun and joy with yo...

Page 23: ...ttach the four middle grills Do so as described on the pages After assembling the roof grills you can start glazing the side area and then you can start glazing the roof This will give you the needed stability phase 9 glazing of the teahouse Only now you can start the glazing on the side elements For this look at page and page The GHD gaskets are pulled into the appropriate grooves of the profile ...

Page 24: ...12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 You will need following Slide the amount of hexagon head screws M6 x 12 in the groove of the edge grill Slide the amount of hexagon head screws M6 x 12 in the groove of the KPT grill Slide the amount of hexagon head screws M6 x 12 in the groove of the TR grill Screw all three grill types to the soil ...

Page 25: ...detail in the prepared condition in the installed condition 25 3 1 2 ...

Page 26: ...e drain Screw the grills to the drain and nut M6 Slide the displayed amount of hexagon head screws M6 x 12 into the drain Below the drain in the area o the door you have install the TR grill with the preassembled rectangular pipe You will need the countersunk screws 4 8 x 60 Place the cover on the soil profile at the door area Take the cover as a template and drill holes in the soil profile The co...

Page 27: ...detail in the prepared condition in the installed condition 27 6 4 5 ...

Page 28: ...mble soil profile and perpendicular grills M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 You will need following Slide the displayed amount of hexagon head screws M6 x 12 in the groove of the KPT grills Slide the displayed amount of hexagon head screws M6 x 12 in the groove of the TR grills Screw both grill types to the soil profile and nut M6 1 2 3 3 2 1 M6 x 12 P8 P5 P5 P8 P1 P...

Page 29: ...detail in the prepared condition in the installed condition 29 3 1 2 ...

Page 30: ...following Slide the displayed amount of hexagon screws M6 x 16 in the groove of the TR grill Screw from above the TR grill with the countersunk screws across to the TR grill For the lateral fixation of the TR grill cross to the TR grill you will need the countersunk screws 4 2 x 38 7 8 M6 x 16 M6 x 16 xountersunk screw 4 2 x 38 countersunk screw 4 2 x 38 P6 countersunk screw 4 2 x 38 ...

Page 31: ...detail in the prepared condition in the installed condition 31 7 8 ...

Page 32: ...emble drain You will need following Slide the connector into the drain Screw the grills to the drain Slide the displayed amount of the hexagon head screws into the drain Below the drain in the area of the window you have to install the TR grill with the preassembled rectangular pipe For that you will need the countersunk screws 4 8 x 60 5 4 countersunk screw 4 8 x 60 M6 x 12 M6 x 12 M6 x 12 M6 x 1...

Page 33: ...detail in the prepared condition in the installed condition 33 4 5 ...

Page 34: ...d be arranged slide the drain connector into the drain of two elements Now slide all four side panels together and fasten them in the area of the soil profile and below the drain The edge connector drain inside has to be placed on the screws of the edge drain Please do not tighten the screws yet 10 11 9 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 12 You can decide for your...

Page 35: ...detail in the prepared condition in the installed condition 35 11 9 10 ...

Page 36: ...1915 mm P26 8 door wing profile up down 638 mm P27 2 door wing profile with pipe 1915 mm P28 4 transverse door latch 572 mm overview pos no required quantity existing quantity designation purpose of use art no V39 1 counterpart for door holder 9999 S44 1 countersunk screw M5 x 10 DIN 985 9999 0169 S42 1 nut M5 DIN 934 9999 0 V38 1 door holder 9999 0 36 carton 8 Please check the quantity of the sup...

Page 37: ...w 4 2 x 38 DIN 7982 9999 0163 S28 2 countersunk screw 4 8 x 60 DIN 7982 9999 0167 S46 6 countersunk screw 4 8 x 50 DIN 7982 9999 0379 S29 4 countersunk screw 4 2 x 60 DIN 7982 9999 0161 S26 4 fillister head screw 4 2 x 32 DIN 7981 9999 0146 overview pos no required quantity existing quantity designation purpose of use art no V44 2 handel set 8pcs 9999 0379 37 accessories double revolving door 2x ...

Page 38: ...tside corner angle countersunk screw 4 2 x 38 countersunk screw 4 8 x 50 countersunk screw 4 8 x 50 countersunk screw 4 8 x 50 countersunk screw 4 8 x 50 countersunk screw 4 2 x 38 countersunk screw 4 2 x 38 13 Slide the corner angles into the door wing profile right and into the door wing profile middle Slide the door wing profile top bottom on the corner angle so that a complete frame is formed ...

Page 39: ...detail in the prepared condition in the installed condition 39 12 13 ...

Page 40: ...rew 4 2 x 38 countersunk screw 4 8 x 60 countersunk screw 4 8 x 50 countersunk screw 4 8 x 50 countersunk screw 4 8 x 60 countersunk screw 4 2 x 38 countersunk screw 4 2 x 38 14 Slide the corner angles into the door wing profile left and into the door wing profile middle Slide the door wing profile top bottom on to the corner angles so that a complete frame is formed Screw the frame in to the corn...

Page 41: ...detail in the prepared condition in the installed condition 41 12 14 ...

Page 42: ...ps You will need following 15 view from outside Assemble the hinge tops on the door wings left and right Use the countersunk screws 4 8 x 19 for screwfitting hinge top countersunk screw 4 8 x 19 countersunk screw 4 8 x 19 countersunk screw 4 8 x 19 hinge top hinge top hinge top hinge top hinge top door wing right door wing left ...

Page 43: ...detail in the prepared condition in the installed condition 43 15 ...

Page 44: ... will need following 16 view from outside Assemble the hinge base parts on the door element Use the countersunk screws 4 8 x 25 for screwfitting countersunk screw 4 8 x 25 hinge base part hinge base part hinge base part countersunk screw 4 8 x 25 countersunk screw 4 8 x 25 hinge base part hinge base part hinge base part door element door element ...

Page 45: ...detail in the prepared condition in the installed condition 45 16 ...

Page 46: ...unt pos designation 1 V44 door handle set 8pcs 46 double revolving door 2x step 11 assembly of the door handle set You will need following 1 2 3 4 5 6 7 8 9 Assemble the door handle set as described above ...

Page 47: ... wing profile left with hinge drilling 1168 mm P30 2 door wing profile right with hinge drilling 1168 mm P31 2 door wing profile middle 1168 mm P32 8 door wing profile up down 638 mm P33 2 door wing profile with pipe 1168 mm 47 carton 9 Please check the quantity of the supplied profiles double window 2x ...

Page 48: ...gle 50 50 6 24 7 9999 0065 V28 1 sash lock small recess mounted 9999 0023 V40 2 sash lock large offset 9999 0022 S50 4 countersunk screw 4 2 x 38 DIN 7982 9999 0163 S29 4 countersunk screw 4 2 x 60 DIN 7982 9999 0161 S26 4 fillister head screw 4 2 x 32 DIN 7981 9999 0146 48 accessories double window 2x ...

Page 49: ...e of use art no hand lifting device incl stationary mandrel V85 consisting of 4 S1 6 nut M6 9999 0128 S24 8 star grip M6 9999 0363 V115 4 fixing bracket 9999 0 S5 4 hexagon head screw M6 x16 9999 0183 S2 2 hexagon head screw M6 x30 9999 0126 S55 2 flat nut M6 9999 0186 49 ...

Page 50: ... 4 2 x 38 You will need following 12 view from outside corner angle countersunk screw 4 2 x 38 countersunk screw 4 2 x 38 countersunk screw 4 2 x 38 Slide the corner angles into the door wing profile right and into the door wing profile middle Slide the door wing profile top bottom on the corner angles so that a complete frame is formed Screw the frame in the corners with the countersunk screws 4 ...

Page 51: ...detail in the prepared condition in the installed condition 12 51 ...

Page 52: ...k screw 4 2 x 60 12 corner angle countersunk screw 4 2 x 38 countersunk screw 4 2 x 38 countersunk screw 4 2 x 60 Slide the corner angles into the door wing profile left and into the door wing profile middle Slide the door wing profile top bottom on the corner angles so that a complete frame is formed Screw the frame on the side with the preassembled rectangular pipe in the corners with the counte...

Page 53: ...detail in the prepared condition in the installed condition 53 12 ...

Page 54: ...e of the hinge tops You will need following 15 view from outside Assemble the hinge tops on the window wings left and right Use the countersunk screws 4 8 x 19 for screwfitting hinge top countersunk screw 4 8 x 19 countersunk screw 4 8 x 19 hinge top hinge top hinge top window wing right window wing left ...

Page 55: ...detail in the prepared condition in the installed condition 55 15 ...

Page 56: ... the hinge base parts view from outside hinge base part window element hinge base part hinge base part window element hinge base part 16 countersunk screw 4 8 x 25 countersunk screw 4 8 x 25 You will need following Assemble the hinge base parts on the door element Use the countersunk screw 4 8 x 25 for screwfitting ...

Page 57: ...detail in the prepared condition in the installed condition 57 16 ...

Page 58: ...ofile Compress the gaskets when setting in as they pull together when its cold dash dot line KPT grill dashed line TR grill Make sure that 1 mm lip of the seal show to the inside of the profile when pressing in the system gasket door element window element ...

Page 59: ...e gaskets when setting in as they pull together when its cold dash dot line KPT grill Before you assemble the roof grills pull the gasket into the KPT grill Make sure that 1 mm lip of the seal show to the inside of the profile when pressing in the system gasket roof element ...

Page 60: ...S1 nut M6 60 dome step 18 assembly of the dome You will need following 17 18 19 Assemble the edge or middle grills with hexagon head screws M6 x 12 to the lower pressure ring and fasten them to nut M6 Insert an additional screw M6 x 12 into the grills The hexagon head screws M6 x 16 come in the lower pressure ring Now you can connect them loosely with a nut M6 ...

Page 61: ...detail in the prepared condition in the installed condition 61 17 18 19 ...

Page 62: ... 19 assembly of the dome You will need following 20 21 22 slide the glazing in Then the upper pressure ring gets placed while the glazing is threaded Then screw the grills with the hexagon head screws M6 x 12 and nut M6 on to the upper pressure ring To avoid a falling out glazing simply press a piece of GHD gasket into the edge grill ...

Page 63: ...detail in the prepared condition in the installed condition 63 20 21 22 ...

Page 64: ...20 assembly of the dome You will need following Glue on the hood by placing a stripe of silicone in place of the upper compression ring and then fix the hood on it For additional fixing of the hood use the drilling screws 3 5 x 16 Now press the wedge gasket in the bottom and top Assemble the cover profile with fillister head screw 4 2 x 16 See the hints of page Press the GHD gasket in the edge gri...

Page 65: ...detail in the prepared condition in the installed condition 65 23 24 25 ...

Page 66: ...ment step 21 assembly of the middle roof grills and the dome You will need following 26 27 The height of the dome ca 2800 mm is obtained by the assembly of the KPT grills The hexagon head screws M6 x 16 that are pre assembled in the dome you will need for screwing the KPT grills For this step you need helping hands that hold the dome M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 16 M6 x 16 M6 x 16 M6 x 16 ...

Page 67: ...detail in the prepared condition in the installed condition 67 26 27 ...

Page 68: ...tion hexagon head screw M6 x 12 and nut M6 in the dome then install the KPT grill to the dome Fasten the KPT grills with the hexagon head screws M6 x 12 and nut M6 at the bottom of the groove connection Repeat this process 26 27 KPT grill KPT grill Dom KPT grill KPT grill M6 x 12 M6 x 12 M6 x 12 M6 x 12 M6 x 16 M6 x 16 M6 x 16 M6 x 16 ...

Page 69: ...detail in the prepared condition in the installed condition 69 26 27 ...

Page 70: ...x 16 8 S1 nut M6 pre assembled in dome 16 S1 nut M6 70 roof element step 23 assembly of the roof grill edge You will need following 28 29 In this step it is neccessary that you have to drill some hole by yourself 30 air handling purlin air handling purlin air handling purlin 2x air handling purlin 2x air handling purlin 2x M6 x 12 M6 x 16 M6 x 16 M6 x 16 M6 x 16 M6 x 16 M6 x 12 M6 x 16 M6 x 12 M6 ...

Page 71: ...detail in the prepared condition in the installed condition 71 30 28 29 ...

Page 72: ...step 2 and step 5 Connect the parts together loosely The edge connecter is pushed up as far as possible Thus is the fitting of the drill holes that you need to drill so that you can screw the air handling purlin to it For this step use the drill Ø6 5 mm Lift the air handling purlin a little so that you can set in a screw M6 x 16 Now place the air handling purlin through the drain connection and th...

Page 73: ...detail in the prepared condition in the installed condition 73 30 28 29 ...

Page 74: ... grills 16 S12 hexagon head screw M6 x 12 16 S1 nut M6 74 roof element step 25 assembly of the roof grills 1 You will need following 31 32 M6 x 12 For lack of space only the amount of screws of the front grills are shown For better understanding also note the following page 33 M6 x 12 M6 x 12 M6 x 12 ...

Page 75: ... the groove of the KPT grills Screw the KPT grill to the drain connection Now stuck the roof grill connecter loosely on the hexagon head screw The hub of the connecter is given by the assembly of the remaining KPT grills Repeat this process with the remaining KPT grills 2x per roof element Now all screws and nuts can be tightened KPT grill KPT grill 33 ...

Page 76: ...S12 hexagon head screw M6 x 12 16 S1 nut M6 S45 fillister head screw 4 2 x 16 76 roof element step 26 assembly of the roof grills 2 You will need following 31 32 M6 x 12 For lack of space only the amount of screws of the front grills are shown For better understanding also note the following page M6 x 12 M6 x 12 33 ...

Page 77: ...detail in the prepared condition in the installed condition 77 31 32 33 ...

Page 78: ...o the drain connecter Now stuck the roof grill connecter loosely on the hexagon head screw The hub of the connecter is given by the assembly of the remaining KPT grills Repeat this process with the remaining KPT grills 2x per roof element The end caps of the roof grills has to be screwed to the grills with the fillister head screw 4 2 x 16 Now all screws and nuts can be tightened KPT grill KPT gri...

Page 79: ... all covering profiles 6 mm So the glass of the side elements does not get in touch with metal please prepare the glassblocks This only effects glazing in the soil profile To achieve better stability you begin the glazing with the angle glaze in the side elements The glass blocks will be devided according to the lenght with scissors or pincers ...

Page 80: ...g 1 and 2 You will need following 1 1 1 1 2 2 2 2 Put the glass block halves on the soil profile Take the glazing 724 x 631 mm 1 and place them onto the soil profile Set the H6 rail on the glazing 1 Now take the glazing 1212 x 631 mm 2 Place this into the H6 rail So the glass does not fall out pull the GHD 1 gasket through the side grills Repeat this process in every corner area ...

Page 81: ...detail in the prepared condition in the installed condition 81 ...

Page 82: ...mm S45 fillister head screw 4 2 x 16 82 glazing Start with the glazing 3 Place it on the KPT grills Now the middle glazing 4 starts Screw the covering profile 6 mm 1453 mm on the KPT grill For this you need the fillister head screw 4 2 x 16 Now place the triangular glazing 5 Screw the covering profile 6 mm 739 mm on the KPT grill Repeat this process in all elements step 28 insert the roof glazing ...

Page 83: ...detail in the prepared condition in the installed condition 83 34 ...

Page 84: ...23 wedge gasket 4 6 mm 84 glazing step 29 assembly the cover angles The wedge gasket 4 6 mm is pressed in the circumferential area of the dome namely where the glazing is pushed into the dome Screw the cover angle on to the air handling purlin with drill screws 3 5 x 16 You will need following ...

Page 85: ...detail in the prepared condition in the installed condition 85 35 36 ...

Page 86: ...of glazing 6 7 and 8 glazing You will need following Put the glazing 6 on the KPT grill Screw the covering profile 6 mm 1787 mm on the KPT grill For this you will need the fillister head screws 4 2 x 16 Now the middle glazing starts 7 Screw the covering profile 6 mm 739 mm on the KPT grill Finally the glazing 8 follows Assemble the covering profile 6 mm 739 mm with fillister head screws 4 2 x 16 t...

Page 87: ...detail in the prepared condition in the installed condition 87 34 ...

Page 88: ...88 double revolving door 2x step 31 insert the double revolving door You will need following Put the double wing revolving door between the hinges so that you can slide the cotter through the hinge base part or hinge top without problems Secure the cotters with the safety pads These prevent the cotters of falling out 37 ...

Page 89: ...detail in the prepared condition in the installed condition 89 37 ...

Page 90: ...ads 90 double window 2x step 32 insert the double window You will need following Put the double window wing between the hinges so that you can slide the cotter through the hinge base part or hinge top without problems Secure the cotters with the safety pads These prevent the cotters of falling out 37 ...

Page 91: ...detail in the prepared condition in the installed condition 91 37 ...

Page 92: ...ing step 33 insert the side glazing 9 and 10 You will need following Put the glass block halves on the soil profile see side Take the glazing 724 x 627 mm 9 and place it onto the soil profile Set the H6 rail on the glazing 9 Now take the glazing 1212 x 627 mm 10 Place this into the H6 rail Screw the covering profile on the KPT grill with fillister head screws 4 2 x 16 Pull the GHD Gasket 1 through...

Page 93: ...detail in the prepared condition in the installed condition 93 38 ...

Page 94: ...d V42 GHD gasket 1 94 glazing step 34 insert the side glazing 11 You will need following Put the glass block halves on the soil profile see side Take the glazing 728 x 622 mm 11 and place it between the soil profile and the TR grill crosswise Press the GHD gasket 1 into the TR grills 11 11 ...

Page 95: ... blocks and adjust the glass Push up the door wing in a closed state as far so that the circumferential spacings are approcimately equal to the door frame Approximately 5 cm from the glass corners you have to position glassblocks in the emerging gapsl Fix the glass blocks with silicone as possible glass block glass block glass block glas block ...

Page 96: ...w glazing You will need following The glass block serve the stabilisation For this please note the instructions on the previous side Insert the glass blocks below onto the profile and then set the glazing on it The glass blocks have different strengthens therefore try out which is suitable for you Once you have aligned the window you can pull the GHD gasket 1 around 12 12 13 13 13 13 ...

Page 97: ...detail in the prepared condition in the installed condition 97 ...

Page 98: ...3 silicone 98 construction end step 37 install the drain blend angles inside and outside You will need following Lay the blend angle from the inside into the drain Screw the blend angle with the hexagon head screw M6 x 12 and nut M6 to the cover angle With silicone you can attach the drain blend angle outside from outside to the drain 39 ...

Page 99: ...detail in the prepared condition in the installed condition 99 39 ...

Page 100: ...ion end step 38 install the down pipes 2x You will need following Determine the height of the holder can be set arbitrarily high Watch out for the side where the drain adapter is There drill a hole Ø4 mm into the roof grill Screw on the holder with fillister head screws 4 8 x 16 For additional fixation screw two drilling screws 3 5 x 16 through the holder into the down pipe 40 41 40 41 ...

Page 101: ...detail in the prepared condition in the installed condition 101 40 41 ...

Page 102: ...install the door holder 4x You will need following Assemble the magnet with countersunk screws 4 8 x 25 to the door holder The component is now screwed to the drain profile with fillister head screws 4 8 x 16 The counterpart is fitted to the door frame so that the counterpart and the door holder are congruent The plastic washer is placed between the profile and counterpart You need the countersunk...

Page 103: ...detail in the prepared condition in the installed condition 103 42 43 ...

Page 104: ...ndlifting device at the bottom of the window wings For this use the fillister head screws 4 8 x 16 Now stuck the fixing bracket on the screws M6 x 16 of the TR grill cross that you have pulled in already in step 4 and align this with the handlifting device Turn flat nuts M6 on the screws M6 x 16 and then you can attach the stationary mandrel Fasten everything with a nut On the other end push the h...

Page 105: ...detail in the prepared condition in the installed condition 105 44 45 46 11 5 m m 11 5 m m ...

Page 106: ...nstall the handlifting device 48 47 To avoid a back and forth swaying door and window wing you require the sash lock The sash lock small will be screwed as seen from the inside to the top and bottom of the rectangular pipe of the door or window wing with drill screws 3 5 x 16 The sash lock large will be installed as seen from the inside with drill screws 3 5 x 16 to the middle of the window wing l...

Page 107: ...detail in the prepared condition in the installed condition 107 47 48 ...

Page 108: ...ion end step 42 pull in the wedge gaskets 1 2 mm You will need following The wedge gasket is pressed from the inside below into the soil profile The door and window area are left out Finally you can put the hexagonal protective caps on the nuts or screw heads your teahouse is now finished 49 49 50 ...

Page 109: ...detail in the prepared condition in the installed condition 109 49 50 ...

Reviews: