amount
pos.
designation
P
drain with preassembled drain adapter (408 mm)
P3
drain connector (408 mm)
P6. TR-grill with pipe 30/5/ (78 mm)
P
cover (78 mm)
drill Ø3,5
S
hexagon head screw M6 x
S8
countersunk screw 4,8 x 60
S6
fillister head screw 4, x 3
6
door element (x)
step
assemble drain
You will need following:
>
Slide the drain connector into the drain.
>
Screw the grills to the drain and nut M6.
>
Slide the displayed amount of hexagon head screws M6 x into the drain.
>
Below the drain in the area o the door you have install the TR-grill with the
preassembled rectangular pipe. You will need the countersunk screws 4,8 x 60.
>
Place the cover on the soil profile at the door area.
>
Take the cover as a template and drill holes in the soil profile.
>
The cover is screwed on with fillister head screws 4, x 3.
5
6
4
countersunk screw 4,8 x 60
fillister head screw 4, x 3
M6 x
M6 x
M6 x
M6 x
M6 x
M6 x
P
P3
P6.
P
Summary of Contents for teahouse
Page 1: ... teahouse assembly instruction state 01 02 2013 ...
Page 25: ...detail in the prepared condition in the installed condition 25 3 1 2 ...
Page 27: ...detail in the prepared condition in the installed condition 27 6 4 5 ...
Page 29: ...detail in the prepared condition in the installed condition 29 3 1 2 ...
Page 31: ...detail in the prepared condition in the installed condition 31 7 8 ...
Page 33: ...detail in the prepared condition in the installed condition 33 4 5 ...
Page 35: ...detail in the prepared condition in the installed condition 35 11 9 10 ...
Page 39: ...detail in the prepared condition in the installed condition 39 12 13 ...
Page 41: ...detail in the prepared condition in the installed condition 41 12 14 ...
Page 43: ...detail in the prepared condition in the installed condition 43 15 ...
Page 45: ...detail in the prepared condition in the installed condition 45 16 ...
Page 51: ...detail in the prepared condition in the installed condition 12 51 ...
Page 53: ...detail in the prepared condition in the installed condition 53 12 ...
Page 55: ...detail in the prepared condition in the installed condition 55 15 ...
Page 57: ...detail in the prepared condition in the installed condition 57 16 ...
Page 61: ...detail in the prepared condition in the installed condition 61 17 18 19 ...
Page 63: ...detail in the prepared condition in the installed condition 63 20 21 22 ...
Page 65: ...detail in the prepared condition in the installed condition 65 23 24 25 ...
Page 67: ...detail in the prepared condition in the installed condition 67 26 27 ...
Page 69: ...detail in the prepared condition in the installed condition 69 26 27 ...
Page 71: ...detail in the prepared condition in the installed condition 71 30 28 29 ...
Page 73: ...detail in the prepared condition in the installed condition 73 30 28 29 ...
Page 77: ...detail in the prepared condition in the installed condition 77 31 32 33 ...
Page 81: ...detail in the prepared condition in the installed condition 81 ...
Page 83: ...detail in the prepared condition in the installed condition 83 34 ...
Page 85: ...detail in the prepared condition in the installed condition 85 35 36 ...
Page 87: ...detail in the prepared condition in the installed condition 87 34 ...
Page 89: ...detail in the prepared condition in the installed condition 89 37 ...
Page 91: ...detail in the prepared condition in the installed condition 91 37 ...
Page 93: ...detail in the prepared condition in the installed condition 93 38 ...
Page 97: ...detail in the prepared condition in the installed condition 97 ...
Page 99: ...detail in the prepared condition in the installed condition 99 39 ...
Page 101: ...detail in the prepared condition in the installed condition 101 40 41 ...
Page 103: ...detail in the prepared condition in the installed condition 103 42 43 ...
Page 105: ...detail in the prepared condition in the installed condition 105 44 45 46 11 5 m m 11 5 m m ...
Page 107: ...detail in the prepared condition in the installed condition 107 47 48 ...
Page 109: ...detail in the prepared condition in the installed condition 109 49 50 ...