Operating and Maintenance Manual
34
©
HOFFMANN PP2-NCF
• Version 7.267 • 12-2017
16.1 Initial start-up
Once all connections have been made, all covers,
shields and access panels must be reinstalled.
Pull to release Emergency-Stop button (1)
Switch-on the main power switch (2)
Switch-on operator console with white button (3).
Touch screen (4) will boot up and indicate when
machine ready for operation.
Initiate initial reference sequence
– see separate
instructions