OM-227 978 Page 14
5-3. Installing Work Clamp
1
Nut
2
Work Cable From Unit
3
Work Clamp
4
Screw
5
Work Clamp Tabs
Bend tabs around work cable.
6
Insulating Sleeves
Slide one insulating sleeve over
work cable before connecting to
clamp.
Slide insulating sleeves over
handles.
802 456-A
.
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
Tools Needed:
7/16 in.
7/16 in.
1
2
3
4
5
6
Summary of Contents for Handler 210
Page 14: ...OM 227 978 Page 10 ...
Page 26: ...OM 227 978 Page 22 6 2 Weld Parameter Chart For 230 VAC Model ...
Page 27: ...OM 227 978 Page 23 227 949 B B ...
Page 33: ...OM 227 978 Page 29 Notes ...
Page 34: ...OM 227 978 Page 30 SECTION 8 ELECTRICAL DIAGRAM Figure 8 1 Circuit Diagram ...
Page 35: ...OM 227 978 Page 31 227 951 B ...
Page 46: ...OM 227 978 Page 42 Notes ...
Page 52: ...Notes ...
Page 54: ...Notes ...