OM-498 Page 13
SECTION 4 – INSTALLATION
4-1.
Installing Welding Generator
install1 1/97 – 802 512-A / Ref. 151 556 / 158 936-A / S-0854
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
OR
Movement
Airflow Clearance
Location
4-2.
Grounding Generator To Truck Or Trailer Frame
install1 1/97* – Ref. 151 556 / S-0854
Always ground generator
frame to vehicle frame to pre-
vent electric shock and static
electricity hazards.
1
Generator Base
2
Metal Vehicle Frame
3
Equipment Grounding
Terminal
4
Grounding Cable
Use #10 AWG or larger insulated
copper wire.
If unit does not have GFCI
receptacles, use GFCI-
protected extension cord.
1
2
Electrically bond generator frame
to vehicle frame by metal-to-metal
contact.
GND/PE
3
4
2
OR
Summary of Contents for 1435
Page 4: ......
Page 35: ...OM 498 Page 31 198 014 C Figure 9 2 Wiring Diagram For Welding Generator ...
Page 36: ...OM 498 Page 32 201 026 A Figure 9 3 Wiring Diagram For Auxiliary Power Panels 1 Of 2 ...
Page 37: ...OM 498 Page 33 201 026 A Figure 9 4 Wiring Diagram For Auxiliary Power Panels 2 Of 2 ...
Page 53: ...OM 498 Page 49 Notes ...
Page 58: ...OM 498 Page 54 Notes ...