
24
a)
Use 2 pcs of Screw M8*20 with 2 pcs of washer to solid
the meter tube. ( Don’t fasten screw at first ).
b)
Use 2 pcs of Screw M8*60 with 2 pcs of washer, 2 pcs of nut to solid the meter tube. ( Don’t fasten screw at first ).
c)
Use 2 pcs of Screw M8*20 with 2 pcs of washer to solid the meter.( Don’t fasten screw at first ).
d)
After the machine is power on,push “ Start” ,if everything goes well,then fasten screws mentioned in front steps.
STEP 2
:
Disassemble connecting screw for base frame
STEP 3:
Install decorating cover at base
Use 6 pcs of Screw ST4.2*15 to solid left and right decorating cover at base.
Ensure all fixings are tightly secured and the treadmill is well constructed.
FOLDING INSTRUCTIONS
Before folding,please switch off and pull off the plug.
Use your hand to lift the running board until it has been locked.
Unfolding
:
Step on the supporting tube and pull running board with your hands. The running board will fall to the ground slowly.
Disassemble this
screw
Screw ST4.2*15
Summary of Contents for BE8510-i
Page 1: ...INSTRUKCJA U YTKOWANIA MANUAL INSTRUCTION N VOD K OBSLUZE...
Page 19: ...18...
Page 38: ...37...
Page 56: ...55...
Page 58: ...57...