11
Primary/Secondary Base Station Setting
On the right side of the base stations, leave the BASE switch
in the PRI position for the primary base station . Move the
BASE switch to the SEC position on each secondary base
station, and then press the base station POWER switch twice
to turn the power off and back on again .
BASE switch
Right side of base station
Multiple Base Stations
Up to 20 coaches can communicate using the DX300 (five per base station) by interconnecting up to four base stations as
described below . With multiple base stations, one will be considered the main or primary base station, and all others will
be considered secondary base stations .
Initialize Multiple Base Stations
Multiple base stations must be “initialized” according to the following instructions,
so their frequencies will not cause self-interference . After initializing each base
station, register each beltpac and/or all-in-one headset that will be used with that
base station .
1
With the primary base station powered on first, turn on the secondary base
station . The STATUS window will display a double bar .
2
Press the REGISTER button on the primary base station . The STATUS window will show a small “o” .
3
Press the REGISTER button on the secondary base station to assign it a number (1, 2 or 3) .
Wait until the base is initialized (approximately 10 seconds) .
4
When initialization is complete, the STATUS window will show one bar .
5
Press the REGISTER button on the primary base station to clear the STATUS window .
The display will also go blank after timing out .
6
Repeat steps 1 – 5 to initialize up to three secondary base stations .
CAUTION
: If more than two base stations will be used, each secondary base station must be
assigned a different number (1, 2 or 3), or interference will occur
RECOMMENDED
: If only two base stations will be used, set the secondary base station to #2
HINT!
Mark each base station with its assigned number, and then, when registering beltpacs
and/or all-in-one headsets, mark
Status window
with double
bar
NOTE:
If the primary base is powered off for more than
30 seconds, all secondary bases will begin to operate
independently . When that happens, the STATUS
window on each base will show 3 bars .
If the primary base is turned back on, it will be
necessary to press the RESET switch on each
secondary base, to allow it to initialize to the primary
base again .
Reset Switch
Status window
with triple bar