HLT-1110 Series
HITROL CO., LTD. 19
■ Gauge Support
- Install the gauge support on the outside wall of the tank.
- When securing the gauge head to the gauge support, it should be installed in the center of the mounting
of the gauge support as it is bolted. [Refer to Figure.13]
■ Gauge Head
- Make sure that the measuring tape does not twist or fold.
- Make sure that the measuring tape does not deviate from the sheave elbow while installing and that it
is properly located in the groove of the sheave elbow after installation.
- Do not loosen the spring locking screw. If not, it may result in the spring escaping, causing the spring
drum to rapidly tangled, which may damage human life.
The tank level gauge is installed and ready for use right away when properly adjusted.
No special use procedures or sequences are required for the user.
The operating checker is on the front surface of the gauge head and turns in clockwise 90 degrees
(1/4 turns) to lift the float slightly. This operation allows the user to observe that all parts of the
gauge are working.
[Figure. 13] Gauge Support Installation
However, use of excessive force may damage the operating checker.
Gauge
Operation