7
IOM_CCHIBA-CSTIBA_301_207925_170706_EN
CCHIBA/CSTIBA
SPLIT HORIZONTAL INVERTER UNITS
PACKAGED AIR-AIR
RECEPTION
INSPECTION
Units are delivered with special protective packing; therefore when it arrives, please inspect it carefully to check that
no damage has occurred during transport and that the unit has been supplied complete with all parts specified in the
order. If any damage is found, immediately file a claim with the transport company. (first 48h)
Verify the correct voltage of the nameplate and make sure it’s in accordance with local power supply.
In case of any flaw or anomaly detected, please contact HITECSA.
RIGGING
Before moving the unit, make sure that all panels are well fixed.
Raise and set down the equipment carefully.
Do not tilt the unit more than 15 degrees during transportation (Fig. 2).
When lifting the unit, make sure that it’s balanced and stable; bear in mind that the heaviest part is where the
compressor is installed.
STORAGE
If the equipment is going to be stored please follow the instructions below in order to avoid damages, corrosion or
deterioration:
Keep the unit away from direct sunlight, rain, sand, wind or temperatures above 50ºC.
Storage temperature: maximum 50ºC, minimum -10ºC.
Maximum humidity: 90%.