2–32
Installation Requirements
Hitachi Universal Storage Platform VM Installation Planning Guide
•
Figure 2-21: Connecting to Universal Power Supply (UPS)
PS11
PS12
PS21
PS22
CL 1
CL2
PS00
PS01
PS10
PS11
PS20
PS21
PS30
PS31
DKU-R0
Disk Chassis
SBX-Chassis
DKC
Control Frame
PS00
PS01
PS10
PS11
PS20
PS21
PS30
PS31
DKU-R1
Disk Chassis
CB
CB
CB
CB
CB
CB
CB
CB
PDU
PDU
PDU
PDU
Primary Rack
PS00
PS01
PS10
PS11
PS20
PS21
PS30
PS31
DKU-R2
Dis k Chas sis
PS00
PS01
PS10
PS11
PS20
PS21
PS30
PS31
DKU-R3
Dis k Chas sis
CB
CB
CB
CB
CB
CB
CB
CB
PDU
PDU
PDU
PDU
Secondary Rack
PDP2
PDP1
To UPS
To UPS
To PDP
To PDP
AC Input Line
Branch
Distribution
Box
UPS2
UPS1
PDP: Power Distribution Panel
For the AC Input power, connect one pair of PDUs from each rack to the UPS
and the other pair of PDUs from each rack to the PDP
Connecting to Universal Power Supplies (UPS)
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15
x 15