10.1. PIPING MATERIALS
1. Prepare locally-supplied copper pipes.
2. Select the piping size with the correct thickness and
correct material which can have sufficient pressure
strength.
3. Select clean copper pipes. Make sure there is no dust and
moisture inside. Blow the inside of the pipes with oxygen
free nitrogen to remove any dust and foreign materials
before connecting pipes.
NOTE:
A system with no moisture or oil contamination will give maximum
performance and lifecycle compared to that of a poorly prepared
system. Take particular care to ensure all copper piping is clean
and dry internally.
There is no refrigerant in the cycle of the indoor unit.
CAUTION:
Cap the end of the pipe when pipe is to be inserted through a
hole.
Do not put pipes on the ground directly without a cap or vinyl tape
at the end of the pipe
If piping installation is not completed until next day or over a
longer period of time, braze off the ends of the piping and charge
with oxygen free nitrogen through a Schrader valve type access
fitting to prevent moisture and particle contamination.
Do not use insulation material that contains NH3 because it can
damage cooper pipe material and can be a source of future
leakage.
Insulate the unions and flare-nuts at the piping connection part
completely.
Completely insulate both refrigerant gas and liquid piping between
the indoor unit and the outdoor unit to avoid a decrease of
performance; if not, dew will occur on the piping surface.
¡
Fix Unit to the wall
1. Fix the Unit onto the wall as the figure
indicates. (field supplied stay)
2. Ensure the foundation so that avoid the
deforming and noise.
3. In case of prevention from vibration
transfer to the building, use rubber Mat.
¡
Suspended unit
1. Suspend the unit as the drawing
indicates.
2. Ensure that wall can resist the Outdoor
unit weight indicated in specification
label plate.
3. It is recommended to select each foot
support to bear the full weight of the
unit (in order to consider stress fatigue
applied when unit is working too).
CAUTION:
Pay attention to the following for
installation:
1. Installation shall ensure that outdoor
unit will not incline, vibrate, make
noise or fall down by a blast of
wind or in an earthquake. Calculate
quake-resistance strength to
ensure that installation is strong
enough against falling. Fix the unit
with wires (field supplied) when
installing in a location without walls
or windbreak and likely exposed to
a blast of wind.
2. To use a vibration-proof mat, fix four
places to the front and back.
¡
Installing location where the unit will be exposed to strong wind.
Follow the instructions below to install
on the rooftop or a location without
surrounding buildings, where strong
wind is expected against the product.
1. Choose a location where the outlet
or inlet side of the product will not be
exposed to strong wind.
2. When the outlet is exposed to strong
wind:
Direct strong wind may cause lack
of air flow and adversely affect to the
operation.
CAUTION:
Excessive strong wind against the
outdoor unit outlet may cause inverse
rotation and damage the fan and
motor.
10. REFRIGERANT PIPING & REFRIGERANT CHARGE
Mark
Dimension
Model 3HVRNME-AF 4~6H(V)RNME-AF
A (mm)
529
796
Wall bracket (*)
Anchor Bolts (*)
(*) Field supplied
Rubber Material
(Field Supplied)
REFRIGERANT PIPING &
REFRIGERANT CHARGE
Summary of Contents for RAS-3HVRNME-AF
Page 1: ...INSTALLATION AND OPERATION MANUAL YUTAKI S S80 Series RAS 3 6 H V RNME AF Outdoor Unit ...
Page 2: ......
Page 6: ......
Page 14: ......