3.3 Installation Work
(1)Secure the outdoor unit with the anchor bolts.
Air Flow Direction
15
/01
23
45
66
7B@C<9
/
D<;
A
054
D1E?/
<F
/
GHA
I<<9
/
JB8
A
KHA
LM?@8
1;
/
N1EC?9
:8
;
;
?I/
0<9
A
19
/
O<B@9
?A
?
jrsh
rhh
ts
h
tu
h
vu
uv
vsh
ukv
ukv
rhh
tw
xrkyuge
vf
z{|
}
~
{
f
md{
f
n{|
(2) When installing the outdoor unit, fix the unit by anchor bolts.
OHA
/
A
C8
E/
M<9
A
8
<B/
=C?B/
A
C8
E/
A
PM?
<F
/
1B@C<9
/
Q<;
A
/
8
E/
HE?I3
/
R
F
/
B<A
S
/
8
A
/
8
E/
I8
F
F
8
@H;
A
/
A
</
9
?6<T?
A
C?/
E?9
T8
@?/
@<T?9
3
O<B@9
?A
? 7B@C<9
/
D<;
A
/01
23
/4
566
U7
FA?
9/@
HA
///
V7
/V/
/W
7
(3) Example of fixing outdoor unit by anchor bolts.
!!
"
!!
#
$%
&%
'()
*+
,-
.)
/
$%
.+
01
2344+
%
.05
67-
8)
9%
0.9)
7')
-
8.)
3'%
-
)
:
%
&%
'(
;,')
<.)
4799%
<+
.=
>8.')
?%
<@
,-
%
7')
A.,93@
.9)
,@
.)
'.;.99,@
BC
,00)
?%
<@
,-
%
7')
4@
77:
)
@
3<<.@
=
/
$%
.+
01
2344+
%
.05
(4) Fix the outdoor unit firmly so that declining, making noise, and falling down by strong wind or
earthquake is avoided.
Fix the outdoor unit to the anchor bolts by
special washer of field-supplied
accessory.
NOTE:
To avoid the interference between the
piping construction at the bottom and the
foundation,the dimension marked with *
must be guaranteed.