Hitachi RAM-200FPS Installation & Maintenance Manual Download Page 2

Use the adequate non-flammable refrigerant(R410A) to the outdoor unit in refrigerant cycle. Do not charge Oxygen, 

acetylene or other flammable and poisonous gases. These types of gases or extremely dangerous can cause an explosion 
and fire. 

 

 

Caution 

Condensation water drain pipe, make sure that under the good drainage during piping work. If it is not really, it will result in water 

inside the room or get wet furniture phenomenon. 

Please tighten the flare nut with specification torque. If the torque too much, it will result in flare nut cracking, and make the 

refrigerant leakage phenomenon. 

During the field decoration construction, prohibition of the unit operation, and prepare the unit to prevent dust and defacement. 

Before the unit operation, please make sure is the field cleaned finish? Objects floating in the air, has the smell cleared? Has the unit 

been cleaned? To prevent future the unit is not cold or water leakage. 

 

 

  1. Common Items 

  1.1 Combination of Indoor Unit and Outdoor Unit   

Please refer to the table, the selection of outdoor unit and indoor unit number and capacity. 

Outdoor Unit Model 

Indoor Unit 

Combination Capacity of Ratio 

(For Outdoor Unit) 

Combination Quantity 

Minimum Individual Operation 

Capacity 

RAM-200FPS(D) 

100~130% 

4~5 

2.2kW(2000kcal/h) 

RAM-250FPS(D) 

RAM-270FPS(D) 

For the system which all indoor units are operated simultaneously, the total indoor unit capacity should be less or equal 

to the outdoor unit capacity. 

For the system which all indoor units are not operated simultaneously, the total indoor unit capacity is available up to 

maximum against the outdoor unit capacity. 

 

  1.2 Operation temperature range   
 

         

Condition 

Item 

Air inlet temperature   

of outdoor unit 

Air inlet temperature of indoor unit

 

(Non- room temperature) 

Cooling 

-5

  DB 

  43

  DB 

21

  DB/15

  WB 

  32

  DB/23

  WB 

DB: Dry Bulb      WB: Wet Bulb

 

 
  1.3 Cooling operating instructions   

The same refrigerant system of indoor unit, the cooling shall be operated. 

  1.4 Note   

This system can not operate within 4 hours of powered, stop reason code will be displayed "d1-22", 
If you want to operate in 4 hours, please follow the steps to release the protection settings: 

1) Please power ON indoor and outdoor unit. 
2) Wait 30 seconds. 
3) Press the outdoor 

unit’s arrangement of PSW1 above 3 seconds. 

 

2.

 Transportation and Handling 

 2.1 When transporting the outdoor unit, please observe the following items, please state as much as possible to keep the 

packaging moved to the location of installation.

  

 

●The hanging method under packing situation: 

Please hang the unit under packing condition with two ropes. 

 
 
 
 
 

 

 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

Handle

 

Wooden 

Base 

 

The 

center of 

gravity 

60

O

Above 

Rope

 

吊掛時,請勿拆除
頂框及打包帶。 

0.7

1.0m

 

利用繩索穿過木台之左右吊掛孔

 

Push through wire rope into the hang 

hole and clamp it by using shackle. 

 

When hanging work, 
do not remove the top 
packing material and 
packing tape.

 

Summary of Contents for RAM-200FPS

Page 1: ...y or death Enforcement matters Machine with a ground terminal the user must follow the instructions for ground work Prohibitions Enforcement matters Indicating the general behavior Non specific object About electrical works DANGER When perform electrical work please have a qualified personnel Please note that the construction is not completely by yourself there will be occurred an electric shock P...

Page 2: ... system which all indoor units are operated simultaneously the total indoor unit capacity should be less or equal to the outdoor unit capacity For the system which all indoor units are not operated simultaneously the total indoor unit capacity is available up to maximum against the outdoor unit capacity 1 2 Operation temperature range Condition Item Air inlet temperature of outdoor unit Air inlet ...

Page 3: ... shall be used with the flaring tube adjustment gasket 1mm Using the 1 2H pipe situation can not be processed R410A special flaring tool can be used directly in the R407C Flaring for Tubes Extrusion Adjustment Gauge not use Dimensional Control for Extrusion Portion of Tube after Flaring Pipe Bender Using the 1 2H pipe situation can not be processed Please use the elbow welding connection Bending E...

Page 4: ...6 15 88 19 4 19 7 19 05 23 3 Can not be processed 1 2H material Please use the attached flare connecting pipe Pipe thickness selected With the design pressure changes the pipe thickness and material should also be changed Pipe Size Existent Type New Refrigerant R22 R407C R410A Thickness Material Thickness Material Thickness Material Φ6 35 0 6 O 0 8 O 0 8 O Φ9 53 0 8 O 0 8 O 0 8 O Φ12 7 0 8 O 0 8 O...

Page 5: ...is a high level of oil mist salty air or harmful gases such as sulphur 12 Do not install the outdoor unit where the electromagnetic wave is directly radiated to the electrical box 13 Install the outdoor unit as far as at least 3 meters from the electromagnetic wave radiator Strong wind blowing directly against the product installation method Installed on the roof and no buildings surrounding and t...

Page 6: ...ed 350 Above 300 Above 100 Above Front Side Note Must install the wind break cover plate Option and the both sides must be opened Note Must be opened on both sides A separate installation A row installation two more 350 Above 300 Below 350 Above 300 Below 1000 Above 350Above 1000 Above 100Above 350 Above Setting two sets situation 300 Below 100 Above 100Above 300 Below 1000 Above Front Side 350 Ab...

Page 7: ...sealed A separate installation A row installation two more Front Side 50Above 100Above 700 Above Note Must install the wind break cover plate Option and the both sides must one side be opened at least With the unit rear side same direction 350 Above 700Above Note Must install the wind break cover plate Option and the both sides must be opened 700Above 350Above 150 Above 700Above 100 Above A separa...

Page 8: ...t to withstand full weight of the outdoor unit 560 Hole 4 Φ16 x 23 5 Long Hole If ensure 170 dimension and without interference with foundation base it can be downward the piping work To avoid the unit vibration transmitted to the buildings if necessary to install anti vibration rubber Fixed Bracket Fielded supplied 21mm Below A After Cut Off Concrete Anchor Bolt Shelf Width 60 mm Standard Parts O...

Page 9: ... easy to produce powder Cautions for refrigerant piping work for example 2 Piping Direction The pipe can be connected in four directions Convex Drain Connector Washer Base Drain Hole When installing pipe through the wall Secure a cap at the end of the pipe Hole of wall Attach a cap or vinyl tape Attach a cap or vinyl tape Attach a cap or vinyl tape Do not place the pipe directly on the ground Rubb...

Page 10: ...lease make the gap of the upper A division remove part of piping In the unit s internal piping and wiring do not interfere with each other 2 3 Connection piping bending use the pipe bender 2 4 In order to metal plate s burrs does not hurt to wiring and piping Please use the insulation material Field supplied materials to protect them Open the service cover essentials 1 Please remove the left screw...

Page 11: ...m Piping Length Actual Length L1 L2 l 3 100m Below Equivalent Length L1 L2 l 3 120m Below The Total Length L1 L2 l0 l1 l2 l 3 250m Below Maximum Lift between Outdoor Unit and Indoor Unit The outdoor unit is higher than that of indoor unit H 1 40m Below The outdoor unit is lower than that of indoor unit H 1 30m Below Between each indoor unit H 2 15m Below Maximum Piping Length Between Each Multi ki...

Page 12: ...connected to the indoor unit be sure to use an optional parts of the multi kit pipe set in order to prevent the uneven distribution of the refrigerant and causing the unit s capacity reduction Do not connect using the connector 1 Line branch use the line branch pipe As shown below Main pipe The pipe between each multi kit pipe or the pipe between outdoor units to first multi kit pipe Main Branch T...

Page 13: ... Correct Setting Wrong Setting First Main Branch Second Main Branch First Branch Second Branch Third Branch First Main Branch Second Main Branch First Branch Second Branch Third Branch X Wrong Outdoor Outdoor Outdoor Outdoor First Main Branch First Main Branch Second Main Branch Second Main Branch First Branch First Branch Second Branch Second Branch Third Branch Third Branch X Wrong Fourth Branch...

Page 14: ...vibration of the piping Pay special attention in case of short piping length 4 Please perform the air tight test Connect the gauge manifold using charging hoses with a vacuum pump or a nitrogen cylinder to the check joints of the liquid line and the gas line stop valves Perform the air tight test Connect a manifold gauge to the check joints of the liquid and gas stop valves in the outdoor unit Do ...

Page 15: ...nt R410A which directly touch refrigerant 3 If vacuum degree of 0 1MPa 750mmHg is not available it is considered that leakage exists Check for any gas leakage once again If no leakage exists operate the vacuum pump for one to two hours 5 4 The Additional Refrigerant 1 Outdoor unit has been filled with refrigerant but still based on the length of pipe filled with an appropriate amount of refrigeran...

Page 16: ... will result in weight percent composition changes so can not directly add refrigerant treatment must be re processing system 5 6 Caution of Measure Pressure Data from The Check Joints Measure pressure data of work please from the check joints of gas line stop valve right figureⒶ and the check joints of piping line right figureⒷ to connect And then please according to the different operation state...

Page 17: ...Supply 3Φ 60Hz Maximum Current A ELB Earth Leakage Breaker Power Switch Power Supply Size mm2 Earth Wire Size mm2 Transmission Cable Size Number of Poles Rating Sensitivity Current mA Rating Current A Switch Capacity A Fuse Capacity A 1 2 2 3 4 5 RAM 200FPS 230V 22 3 30 30 60 30 3 5 5 5 2 Core Shielded Twist Pair Cable 0 75mm2 Total Length 1000m Below RAM 250FPS 29 40 40 5 5 RAM 270FPS 37 100 50 1...

Page 18: ...tion wiring construction The transmission cable of indoor and outdoor unit and the 220V power source cord be sure to keep the distance of more than 5 6cm Therefore do not use the coaxial cable If the transmission cable and power source cord connecting wrong will cause the PCB of the outdoor unit burning Please pay special attention 10 Indoor and outdoor unit s power source cord and connection wiri...

Page 19: ...gs shall be attached the insulation tape or insulation sleeve Χ Ο Fold the wire and reserve for a maintenance operation the desired length Prevent need to remove the wiring plug for maintenance Cord Band Operation 1 When wire through the cord band appropriately tighten it as show below 2 Make sure the cord with high and low pressure sensor isolation 3 Tighten the cord to be isolated with pipe comp...

Page 20: ...Do not input the power source to the terminal No 1 2 of transmission wiring 3 When power source wiring phase error the unit can not be operated and the remote controller display alarm code 05 At this time please refer to the electrical box caution nameplate check the phase of the first side and replace it The phase of the replacement work please process under the power source turn off 4 Does the o...

Page 21: ... operation 3 2 Depress RUN STOP switch The TEST RUN operation will be started The 2 hours OFF TIMER will be set and the TEST RUN operation will be finished after 2 hours unit operation or by depressing the RUN STOP switch again 3 3 To end the test run wait for 2 hours or push RUN STOP switch again Number of The Unit 0 1 2 3 4 10 11 63 Timer Setting Display Left Two Digit 01 02 03 04 05 11 12 64 Re...

Page 22: ...ity Low Pressure Thermistor Outdoor 31 System Incorrect Capacity Setting of Outdoor and Indoor Unit Incorrect Capacity Code Setting of Combination Excessive or Insufficient Indoor Unit Total Capacity Code outside of 80 120 35 Incorrect Setting of Indoor Unit No Duplication of Indoor Unit No In Same Ref Gr or The Connection Unit Number Exceeds The Maximum Number of Combination 38 Outdoor Unit Abnor...

Page 23: ...rigerant Temperature Operating Mode Cool Discharge Gas Temperature Td Liquid Pipe Temperature Te 8 Check Pressure Discharge Pressure Pd MPa Suction Pressure Ps MPa 9 Check Voltage Rated Voltage V Operating Voltage L1 L2 V L1 L3 V L2 L3 V Starting Voltage V Phase Imbalance 10 Check Compressor Input Running Current Input kW Running Current A A 11 Is the refrigerant charge adequate 12 Do the operatio...

Page 24: ...24 66MP1306 Printed in Philippines ...

Reviews: