– 27 –
3. MAINTENANCE AT BEGINNING OF LONG OFF PERIOD
●
Run the unit by setting the operation mode to
(COOL), the temperature to 32°C and the fan speed
to HI for about half a day on a fine day, and dry the
whole of the unit.
●
Switch off the power plug.
1
2
3
REGULAR INSPECTION
PLEASE CHECK THE FOLLOWING POINTS BY QUALIFIED SERVICE PERSONAL EITHER
EVERY HALF YEARLY OR YEARLY. CONTACT YOUR SALES AGENT OR SERVICE SHOP.
Is the earth line disconnected or broken?
Is the mounting frame seriously affected by rust and is the
outdoor unit tilted or unstable?
Is the plug of power line firmly plugged into the socket?
(Please ensure no loose contact between them).
Air
Blow
Cleaning and maintenance must be carried out only by qualified service personal. Before cleaning,
stop operation and switch off the power supply.
!
CAUTION
Confirm
Summary of Contents for RAC25NH4
Page 37: ...CIRCUIT DIAGRAM MODEL RAK 25NH4 RAK 35NH4 RAK 50NH4 37 ...
Page 38: ...CIRCUIT DIAGRAM MODEL RAC 25NH4 RAC 35NH4 RAC 50NH4 39 ...
Page 40: ... 42 MODEL RAC 25NH4 RAC 35NH4 RAC 50NH4 MAIN P W B Marking on P W B COMPONENT SIDE ...
Page 90: ... 100 SELF DIAGNOSIS LIGHTING MODE MODEL RAC 25NH4 RAC 35NH4 RAC 50NH4 ...