Performing Universal Volume Manager Operations
5-23
Hitachi Universal Storage Platform V/VM Universal Volume Manager User’s Guide
Figure 5-11
Pop-up Menu of Configure Cross-subsystem Paths Dialog
Box
Changing the Configured Cross-subsystem Path Priority
To change the cross-subsystem path priority, use the
Raise Priority
command and the
Lower Priority
command displayed in the Configure Cross-
subsystem Paths dialog box.
The following is an example of procedure to make the cross-subsystem path to
the currently used path by raising the priority of the cross-subsystem path:
1.
Start Storage Navigator, and open the Volume Operation window.
2.
Make sure that Storage Navigator is in
Modify
mode.
3.
Click the path group to which the cross-subsystem path belongs in the
Volume Operation tree.
4.
Right-click the cross-subsystem path in
Cross-subsystem Paths
in the
Volume Operation list.
5.
Click
Configure Cross-subsystem Paths
in the pop-up menu.
The Configure Cross-subsystem Paths dialog box is displayed.
6.
Right-click the cross-subsystem path that you want to change the priority
of in the
Selected Paths
in the Configure Cross-subsystem Paths dialog
box.
7.
Click
Raise Priority
in the pop-up menu
The row of the selected path switches with the one row above.